No label defined (Q2733016)

From EU Knowledge Graph
Revision as of 12:52, 3 June 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project is a planned energy renovation of a building that comprises five construction measures to improve the thermal insulation of the building (external joinery replacement, thermal insulation of ceilings coating, thermal insulation of external walls, thermal insulation of the floor on the ground, thermal insulation of the roof above heated space), and two mechanical engineering measures (replacement of heating and replacement of gas insta...)
Jump to navigation Jump to search
Project Q2733016 in Croatia
Language Label Description Also known as
English
No label defined
Project Q2733016 in Croatia

    Statements

    0 references
    561,219.96 Croatian kuna
    0 references
    72,958.59 Euro
    2 June 2021
    0 references
    898,058.05 Croatian kuna
    0 references
    116,747.55 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    7 November 2018
    0 references
    7 November 2020
    0 references
    OPĆINA CRNAC
    0 references

    45°31'43.68"N, 17°52'49.26"E
    0 references
    33507
    0 references
    Projektom je planirana energetska obnova zgrade koja obuhvaća pet građevinskih mjera za poboljšanje toplinske zaštitne ovojnice zgrade (zamjena vanjske stolarije, toplinska izolacija stropa premapotkrovlju, toplinska izolacija vanjskih zidova, toplinska izolacija poda prema tlu, toplinska izolacija krova iznad grijanog prostora), te dvije strojarske mjere ( zamjena sustava grijanja i zamjena plinskih instalacija), a sve u cilju smanjenja utroška energije i štetnih emisija CO2. (Croatian)
    0 references
    The project is a planned energy renovation of a building that comprises five construction measures to improve the thermal insulation of the building (external joinery replacement, thermal insulation of ceilings coating, thermal insulation of external walls, thermal insulation of the floor on the ground, thermal insulation of the roof above heated space), and two mechanical engineering measures (replacement of heating and replacement of gas installations), all with a view to reducing energy input and harmful CO2 emissions. (English)
    3 June 2021
    0 references

    Identifiers

    KK.04.2.1.04.0142
    0 references