Revitalisation of Muddle Stream I. stage – revitalisation (Q69640)

From EU Knowledge Graph
Revision as of 22:10, 27 December 2020 by DG Regio (talk | contribs) (‎Changed an Item: Change because item Q214247 was merged with Q4870)
Jump to navigation Jump to search
Project Q69640 in Czech Republic
Language Label Description Also known as
English
Revitalisation of Muddle Stream I. stage – revitalisation
Project Q69640 in Czech Republic

    Statements

    0 references
    1,129,710.0 Czech koruna
    0 references
    45,188.4 Euro
    10 January 2020
    0 references
    1,129,710.0 Czech koruna
    0 references
    45,188.4 Euro
    10 January 2020
    0 references
    100 percent
    0 references
    22 November 2017
    0 references
    31 March 2019
    0 references
    Město Rýmařov
    0 references
    0 references

    49°56'50.82"N, 17°16'19.63"E
    0 references
    79501
    0 references
    Jde o revitalizaci potoka, zahrnující úpravy toku, které vedou k obnovení přirozených funkcí poškozených říčních ekosystémů. Principem je navrácení toku do jeho původního koryta, dle dostupných podkladů o jeho stavu před nešetrnými melioračními úpravami. Součástí revitalizace je návrh mokřadních tůní, jakožto krajinotvorných prvků, který slouží ke zvýšení biodiverzity a pro posílení ekologicko-stabilizačních funkcí. (Czech)
    0 references
    It is a revitalisation of the creek, including adjustments to the flow that leads to the restoration of the natural functions of damaged river ecosystems. The principle is to return the flow to its original trough, according to available documents about its condition before unfriendly melioration adjustments. Part of the revitalisation is the design of wetland pools, as landscape-forming elements, which serves to increase biodiversity and to strengthen ecological-stabilisation functions. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.4.27/0.0/0.0/17_055/0004951
    0 references