Remediation of rock walls – ul. At the Giant Head in Znojmo (Q57764)

From EU Knowledge Graph
Revision as of 19:58, 27 December 2020 by DG Regio (talk | contribs) (‎Changed an Item: Change because item Q214251 was merged with Q4868)
Jump to navigation Jump to search
Project Q57764 in Czech Republic
Language Label Description Also known as
English
Remediation of rock walls – ul. At the Giant Head in Znojmo
Project Q57764 in Czech Republic

    Statements

    0 references
    2,230,288.29 Czech koruna
    0 references
    89,211.53 Euro
    10 January 2020
    0 references
    2,623,868.58 Czech koruna
    0 references
    104,954.74 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    15 July 2016
    0 references
    13 September 2016
    0 references
    30 June 2017
    0 references
    Město Znojmo
    0 references
    0 references
    0 references

    48°51'6.91"N, 16°2'56.18"E
    0 references
    66902
    0 references
    Strategickým cílem projektu je stabilizace a sanace svahových nestabilit, které ohrožují zdraví a bezpečnost osob a majetku na dotčených pozemích a to sanací skalního masívu ve městě Znojmo. Doba realizace stavby se předpokládá 2 měsíce. (Czech)
    0 references
    The strategic objective of the project is to stabilise and remedie slope instability that threaten the health and safety of people and property on the land concerned by remediing the rock massif in Znojmo. The construction is expected to be completed for 2 months. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.24/0.0/0.0/15_003/0000238
    0 references