Thermal modernisation of public buildings in the Piaseczyński District (Q109002)

From EU Knowledge Graph
Revision as of 12:29, 27 December 2020 by DG Regio (talk | contribs) (‎Changed an Item: Change because item Q2524415 was merged with Q6448)
Jump to navigation Jump to search
Project Q109002 in Poland
Language Label Description Also known as
English
Thermal modernisation of public buildings in the Piaseczyński District
Project Q109002 in Poland

    Statements

    0 references
    6,282,767.73 zloty
    0 references
    1,507,864.26 Euro
    13 January 2020
    0 references
    8,656,041.19 zloty
    0 references
    2,077,449.89 Euro
    13 January 2020
    0 references
    72.58 percent
    0 references
    15 July 2015
    0 references
    28 June 2019
    0 references
    POWIAT PIASECZYŃSKI
    0 references

    51°59'3.8"N, 21°12'50.4"E
    0 references

    52°5'0.6"N, 21°7'14.9"E
    0 references

    52°4'28.9"N, 21°1'37.6"E
    0 references
    Celem Projektu jest zwiększenie efektywności energetycznej i poprawa jakości powietrza poprzez poprawę parametrów energetycznych budynków użyteczności publicznej na terenie Powiatu Piaseczyńskiego (PP). Projekt realizowany będzie w partnerstwie PP (Lider) i Gmin: Konstancin-Jeziorna (KJ) i Góra Kalwaria (GK) -Partnerzy, w 8 budynkach użyteczn. publicznej zlokalizowanych na terenie Powiatu Piaseczyńskiego, w tym 5 budynkach należących do PP, 1 – do Gminy KJ i 2-do Gminy GK. Zakres rzeczowy projektu obejmuje termomodernizację następujących obiektów: budynku Starostwa przy ul. Czajewicza 2/4 w Piasecznie (popr. efektywn.energet (EN) - o 84,43%), budynku LO im. I Dywizji Kościuszkowskiej w Piasecznie (EN- 65,31%), budynku szkoły ZS RCKU w Piasecznie (EN- 51,20%), 2 budynków DPS w KJ (1 wolnostoj i 3 połącz - EN od 68,45- do 86,84%). Wszystkie budynki spełniają zatem Kryterium Dostępu (KD) nr 3. Zakres prac służących poprawie efektywności energetycznej określono na podstawie audytów energetycznych (KD nr 1). Cel zostanie osiągnięty poprzez kompleksowe działania termomodernizacyjne, w tym odpowiednio: ocieplenie przegród zewnętrznych obiektu, w tym ścian zewnętrznych, dachów lub stropodachów, wymianę okien/drzwi zewnętrznych , wymianę oświetlenia na energooszczędne, przebudowę systemów grzewczych,budowę systemów wentylacji i klimatyzacji wraz z rekuperacją , zastosowanie automatyki pogodowej , instalację mikrokogeneracji na potrzeby własne , instalację OZE, instalację indywidualnych liczników ciepła oraz c.w.u., instalację zaworów podpionowych i termostatów. W wyniku realizacji projektu nastąpi poprawa efektywności energetycznej dla budynków objętych działaniami termomoderniz. o 64,46% (KMS nr 1). Koszty kwalifikowalne projektu obejmują tylko zadania wskazane w audytach energetycznych (KD nr1). Wnioskodawca wykona audyt energetyczny ex-post (KD nr 2). Projekt jest zgodny z dyrektywami wskazanymi w KD nr 5 oraz przepisami wskazanymi w KF nr 5. (Polish)
    0 references
    The aim of the Project is to increase energy efficiency and improve air quality by improving the energy performance of public buildings in the Piaseczyński District (PP). The project will be implemented in partnership between PP (Leader) and Municipalities: Konstancin-Jeziorna (KJ) and Góra Kalwaria (GK) -Partners, in 8 public buildings located in the Piaseczyński District, including 5 buildings belonging to the PP, 1 – to the Municipality of KJ and 2- to the GK commune. The project’s material scope includes the thermal modernisation of the following facilities: building of the Starostwo at ul. Czajewicza 2/4 in Piaseczno (per. effectwn.energet (EN) – 84.43 %), the building of the First Kościuszkowska Division in Piaseczno (EN-65.31 %), the building of the ZS RCKU school in Piaseczno (EN-51.20 %), 2 DPS buildings in KJ (1 detachment and 3 connect – EN from 68.45-86.84 %). All buildings therefore meet the Access Criterion (KD) No 3. The scope of the work to improve energy efficiency was determined on the basis of energy audits (DRA No 1). The objective will be achieved through comprehensive thermo-modernisation measures, including as appropriate: warming of external partitions of the facility, including external walls, roofs or stropodaches, replacement of windows/doors, replacement of lighting for energy-efficient, conversion of heating systems, construction of ventilation and air conditioning systems with recuperation, use of weather automation, installation of microcogeneration for own needs, RES installation, installation of individual heat meters and central heating, installation of underpilot valves and thermostats. The project will result in an improvement of energy efficiency for buildings covered by thermomodernisation activities by 64.46 % (RBM No 1). The eligible costs of the project cover only the tasks indicated in the energy audits (KD No1). The applicant will carry out an ex-post energy audit (KD No 2). The draft complies with the Directives set out in the PPA No 5 and the provisions set out in the NF No 5. (English)
    17 October 2020
    0 references

    Identifiers

    RPMA.04.02.00-14-5323/16
    0 references