(A19_093_2016_0930072_1071) (Q2066496)

From EU Knowledge Graph
Revision as of 14:34, 2 November 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q2066496 in Italy
Language Label Description Also known as
English
(A19_093_2016_0930072_1071)
Project Q2066496 in Italy

    Statements

    0 references
    5,358.56 Euro
    0 references
    10,717.12 Euro
    0 references
    50.0 percent
    0 references
    1 August 2016
    0 references
    7 August 2018
    0 references
    1 August 2018
    0 references
    GRAPHOPACK S.R.L.
    0 references
    0 references
    0 references

    43°57'15.30"N, 11°23'11.29"E
    0 references
    L'INTERVENTO OGGETTO DELLA PRESENTE RELAZIONE PREVEDE LO SMALTIMENTO DI TUTTA LA COPERTURA ATTUALE IN ETERNIT CON REALIZZAZIONE DI NUOVA COPERTURA CON PANNELLI SANDWICH ISOLANTI E LA SOSTITUZIONE DEL GENERATORE DI CALORE CON NUOVO GENERATORE DI CALORE A CONDENSAZIONE ALIMENTATO A METANO. LO SCOPO DEL PRESENTE INTERVENTO E QUELLO DI SMALTIRE LA COPERTURA IN CEMENTO-AMIANTO PER IL MIGLIORAMENTO DELLA QUALITA AMBIENTALE, CONTEMPORANEAMENTE RIQUALIFICANDO DAL PUNTO DI VISTA ENERGETICO TUTTI I LOCALI INTERNI E MIGLIORANDO TERMICAMENTE TUTTO L'EDIFICIO, GRAZIE ANCHE ALLA SOSTITUZIONE DEL GENERATORE DI CALORE. LE OPERE EDILI CHE SARANNO REALIZZATE CONSISTONO ESSENZIALMENTE NELLO SMALTIMENTO DELLA COPERTURA IN CEMENTO-AMIANTO DI TUTTO IL CAPANNONE, IL RIFACIMENTO DELLA STESSA CON PANNELLI SANDWICH ISOLANTI DI 10 CM DI SPESSORE ED INFINE LA SOSTITUZIONE DEL GENERATORE DI CALORE CON NUOVO GENERATORE A CONDENSAZIONE ALIMENTATO A METANO DI MARCA RIELLO MODELLO STAR CONDENS 29 KIS ED ISTALLAZIONE D (Italian)
    0 references
    THE OPERATION COVERED BY THIS REPORT PROVIDES FOR THE DISPOSAL OF ALL CURRENT COVER UNDER NEW COVER BY SANDWICH PANELS FOR INSULATION AND REPLACING THE HEAT GENERATOR WITH A NEW CONDENSATION HEAT GENERATOR FUELLED WITH METHANE. THE AIM OF THIS ACTION AND THE PURPOSE OF DISPOSING OF THE ASBESTOS CEMENT COVERAGE FOR THE IMPROVEMENT OF THE QUALITY OF THE ENVIRONMENT, WHILE AT THE SAME TIME UPGRADING FROM AN ENERGY POINT OF VIEW ALL THE INTERNAL SPACES AND IMPROVING THE ENTIRE BUILDING, INCLUDING BY REPLACING THE HEAT GENERATOR. THE CONSTRUCTION WORKS TO BE CARRIED OUT CONSIST ESSENTIALLY IN THE DISPOSAL OF THE ASBESTOS CEMENT COVERAGE OF THE ENTIRE BUILDING, THE REFURBISHMENT OF THE BUILDING ITSELF WITH A 10 CM THICK SANDWICH PANELS AND, FINALLY, THE REPLACEMENT OF THE HEAT GENERATOR BY A NEW CONDENSATION GENERATOR FUELLED WITH METHANE LABEL MODEL STAR CONDENS 29 KIS AND INSTALLATION D (English)
    0 references

    Identifiers