(A19_093_2016_0930021_1020) CAR
Project Q2066462 in Italy

    Statements

    0 references
    5,015.0 Euro
    0 references
    10,030.0 Euro
    0 references
    50.0 percent
    0 references
    1 August 2016
    0 references
    19 October 2018
    0 references
    1 August 2018
    0 references
    GIOVANNINI AUTOCARROZZERIA S.R.L.
    0 references
    0 references
    0 references

    43°57'15.30"N, 11°23'11.29"E
    0 references
    IL PROGETTO PREVEDE LA REALIZZAZIONE UNA SOLA TIPOLOGIA DI INTERVENTO, TRA QUEGLI PREVISTI AL PUNTO A) DEL PARAGRAFO 4, ED IN PARTICOLARE CONSISTE NELLA RIQUALIFICAZIONE ENERGETICA DELLA SEDE OPERATIVA DELLA AUTOCARROZZERIA GIOVANNINI SRL, MEDIANTE LA BONIFICA DELL?ATTUALE COPERTURA IN CEMENTO-AMIANTO, PER UNA SUPERFICIE PARI A 256 MQ. IN SINTESI LE FASI OPERATIVE SONO LE SEGUENTI: FASE 1 - ALLESTIMENTO DEL CANTIERE. MESSA IN SICUREZZA DELL?AREA INTERESSATA DAI LAVORI MEDIANTE L?INSTALLAZIONE DI PARAPETTI DI SICUREZZA, CASTELLO DI TIRO PER IL SOLLEVAMENTO DEI MATERIALI, QUADRO DI CANTIERE, WC CHIMICA DA CANTIERE, GRU A TORRE, INSTALLAZIONE DI DISPOSITIVI ANTICADUTA PROVVISORI. FASE 2 - BONIFICA DEI MATERIALI CONTENENTI AMIANTO; INERTIZZAZIONE DEI MATERIALI CONTAMINATI CON APPOSITA SOLUZIONE INCAPSULANTE. IN GRADO DI IMPEDIRE, DURANTE LA FASE DI RIMOZIONE, IL RILASCIO DI MICROFIBRE O POLVERI DI AMIANTO NELL'AMBIENTE. RIMOZIONE DEI MATERIALI CONTAMINATI FACENDO ATTENZIONE A NON FAVORIRE (Italian)
    0 references
    THE PROJECT INVOLVES ONLY ONE TYPE OF INTERVENTION, INCLUDING THOSE REFERRED TO IN POINT (A) OF PARAGRAPH 4, AND IN PARTICULAR THE ENERGY UPGRADING OF THE OPERATIONAL HEADQUARTERS OF THE AUTOROZZERIA GIOVANNINI SRL, THROUGH THE REHABILITATION OF THE CURRENT ASBESTOS CEMENT COVERAGE, FOR AN AREA OF 256 M². THE OPERATIONAL STEPS ARE AS FOLLOWS: PHASE 1 — CONSTRUCTION OF THE YARD. SECURING OF THE AREA AFFECTED BY THE WORK BY MEANS OF THE INSTALLATION OF SAFETY RAILINGS, FIRE GATES FOR LIFTING MATERIALS, SITE FRAMEWORK, ON-SITE CHEMICAL TOILETS, TOWER CRANES, EMERGENCY RELIEF EQUIPMENT INSTALLED. PHASE 2 — REMEDIATION OF ACMS; INERTISATION OF CONTAMINATED MATERIALS WITH SPECIFIC INCAPSLANTE SOLUTION. CAPABLE OF PREVENTING, DURING THE REMOVAL PHASE, THE RELEASE OF ASBESTOS MICROFIBRES OR DUST INTO THE ENVIRONMENT. REMOVAL OF CONTAMINATED MATERIALS, TAKING CARE NOT TO FAVOUR (English)