HOTEL IMPERIA ALL YEAR (Q2073822)

From EU Knowledge Graph
Revision as of 14:08, 2 November 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q2073822 in Italy
Language Label Description Also known as
English
HOTEL IMPERIA ALL YEAR
Project Q2073822 in Italy

    Statements

    0 references
    95,019.38 Euro
    0 references
    190,038.76 Euro
    0 references
    50.0 percent
    0 references
    1 September 2017
    0 references
    30 April 2019
    0 references
    30 July 2019
    0 references
    HOTEL IMPERIA S.N.C. DI FALOPPA ANGELO
    0 references
    0 references
    0 references

    45°32'12.16"N, 12°38'17.99"E
    0 references
    OPERE FINALIZZATE ALL'ALLUNGAMENTO DELLA STAGIONE DAGLI ATTUALI 5/6 MESI AD APERTURA ANNUALE. SOPRAELEVAZIONE DELL'EDIFICIO DI UN PIANO PER LA REALIZZAZIONE DI 7 NUOVE CAMERE, DEMOLIZIONE DI 4 CAMERE ACCORPANDONE LA SUPERFICIE PER REALIZZARNE ALTRE 2. IL TUTTO CON METRATURE E FINITURE ADEGUATE AGLI ATTUALI STANDARD DI MERCATO. DEMOLIZIONE DI 2 CAMERE E RICONVERSIONE SPAZI PER LA REALIZZAZIONE DI AREA WELLNESS: SAUNA FINLANDESE, GROTTA DEL SALE, DOCCIA EMOZIONALE, AREA RELAX. REALIZZAZIONE DI PISCINA IDROMASSAGGIO CON GIOCHI D'ACQUA E COPERTURA DELLA STESSA REALIZZANDO UN GIARDINO D'INVERNO. INSTALLAZIONE DI IMPIANTO FOTOVOLTAICO DI 50KW, SUFFICIENTI A COPRIRE PIU' DEL 50% DEL FABBISOGNO ENERGETICO DELLA STRUTTURA. INSTALLAZIONE DI UNA COLONNINA PER RICARICA AUTOMEZZI ELETTRICI. RIFACIMENTO COMPLETO DELLA FACCIATA DELL'ALBERGO CON UN LOOK MODERNO E DI MIGLIOR IMPATTO VISIVO. POTENZIAMENTO SERVIZIO BIKE. IMPLEMENTAZIONE SERVIZIO CELIACI NELLA RISTORAZIONE. (Italian)
    0 references
    WORKS AIMED AT INCREASING THE SEASON FROM THE CURRENT 5/6 MONTHS TO THE OPENING OF THE YEAR. A CANT OF A PLAN BUILDING FOR THE CONSTRUCTION OF 7 NEW CHAMBERS, THE DEMOLITION OF 4 CHAMBERS, MERGING THE SURFACE TO MAKE UP ANOTHER 2. MEASUREMENTS AND FINISHES APPROPRIATE TO THE CURRENT MARKET STANDARDS. DEMOLITION OF 2 ROOMS AND RECONVERSION AREAS FOR THE REALISATION OF THE “WELLNESS” AREA: SAUNA IN FINLAND, CAVE CAVE, EMOTIONAL SHOWER, AREA RELAX. CARRY A HYDROMASSAGE SWIMMING POOL WITH WATER AND COVER IT BY RUNNING A WINTER GARDEN. INSTALLATION OF 50KW SOLAR SYSTEM SUFFICIENT TO COVER MORE THAN 50 % OF THE STRUCTURE’S ENERGY NEEDS. INSTALLATION OF A POWER CHARGING COLUMN FOR ELECTRIC VEHICLES. COMPLETE REFURBISHMENT OF THE HOTEL FAÇADE WITH A MODERN LOOK AND WITH A BETTER VISUAL IMPACT. IMPROVED BIKE SERVICE. IMPLEMENTATION OF PEOPLE WITH CELIAC SERVICE IN CATERING. (English)
    0 references

    Identifiers

    B59G17001570004
    0 references