ENERGY EFFICIENCY IN PRODUCTION STRUCTURE 2018 (Q2074841)

From EU Knowledge Graph
Revision as of 13:28, 2 November 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q2074841 in Italy
Language Label Description Also known as
English
ENERGY EFFICIENCY IN PRODUCTION STRUCTURE 2018
Project Q2074841 in Italy

    Statements

    0 references
    44,436.68 Euro
    0 references
    88,873.37 Euro
    0 references
    50.0 percent
    0 references
    8 June 2018
    0 references
    11 July 2019
    0 references
    14 December 2018
    0 references
    MASCHIETTO MARIO EREDI S.R.L.
    0 references
    0 references
    0 references

    45°53'26.70"N, 12°20'1.82"E
    0 references
    INTERVENTI FINALIZZATI ALLA RIDUZIONE DEI CONSUMI ENERGETICI E DELLE EMISSIONI DI GAS CLIMALTERANTI DELL'IMPRESA CON PRIORITA' ALLE TECNOLOGIE AD ALTA EFFICIENZA COMPRENDENTE: - INSTALLAZIONE DI SISTEMA COGENERATORE DI 100 KW ELETTRICI; - SOSTITUZIONE DELLE LAMPADE ESISTENTI CON LAMPADE EQUIVALENTI A LED; - INSTALLAZIONE DI SISTEMA DI MONITORAGGIO CONSUMI E PRODUZIONE PUNTUALE; - INSTALLAZIONE DI NR. 2 ECONOMIZZATORI DI RETE; - INSTALLAZIONE DI IMPIANTO SOLARE FOTOVOLTAICO; - INSTALLAZIONE DI SISTEMA DI RIFASAMENTO. (Italian)
    0 references
    MEASURES TO REDUCE ENERGY CONSUMPTION AND EMISSIONS OF CLIMATE-CHANGING GASES INTO HIGH-EFFICIENCY TECHNOLOGIES INCLUDING: — CHP SYSTEM INSTALLATION OF 100 KW; REPLACING EXISTING LAMPS WITH EQUIVALENT LED LAMPS; — INSTALLATION OF DETAILED CONSUMPTION AND PRODUCTION MONITORING SYSTEM; — INSTALLATION OF 2 ECONOMISERS; INSTALLATION OF SOLAR PHOTOVOLTAIC SYSTEM; — RECASTING SYSTEM INSTALLATION. (English)
    0 references

    Identifiers

    B37B18000110009
    0 references