(10360.14072017.115000043) SCHOOL PLUS (Q2056963)

From EU Knowledge Graph
Revision as of 12:07, 2 November 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q2056963 in Italy
Language Label Description Also known as
English
(10360.14072017.115000043) SCHOOL PLUS
Project Q2056963 in Italy

    Statements

    0 references
    390,751.04 Euro
    0 references
    1,083,613.54 Euro
    0 references
    36.06 percent
    0 references
    30 March 2018
    0 references
    30 March 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI PIOMBINO
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    GLI INTERVENTI HANNO LO SCOPO DI MIGLIORARE LE PRESTAZIONI ENERGETICHE E IL COMFORT AMBIENTALE DEL COMPLESSO SCOLASTICO. SI IPOTIZZA INOLTRE DI OTTENERE DEGLI IMPORTANTI RISPARMI ECONOMICI RELATIVAMENTE ALLE SPESE DI ACQUISTO DEL GAS METANO, OVVERO IL COMBUSTIBILE CHE ALIMENTA LA CENTRALE IN PAROLA. GLI INTERVENTI SI ARTICOLERANNO IN DUE LOTTI FUNZIONALI OMOGENEI:UNO RELATIVO ALLA SOSTITUZIONE DEGLI INFISSI E ALL'ISOLAMENTO TERMICO DEL SOTTOTETTOL'ALTRO RELATIVO ALLA SOSTITUZIONE DEI GENERATORI DI CALORE CON GENERATORI A CONDENSAZIONE E INSTALLAZIONE DI SISTEMA DI TELEGESTIONE E TELECONTROLLO IN REMOTO.LOTTO 1I NUOVI INFISSI SARANNO REALIZZATI CON TECNOLOGIA ATTUALE IN LUOGO DEI VECCHI COSTRUITI A PI? RIPRESE NEL CORSO DELLA VITA DELL?EDIFICIO, IN MATERIALI DIVERSI E VETRO SOTTILE.I NUOVI INFISSI SARANNO REALIZZATI IN PVC RIGIDO AI QUALI SARANNO ASSOCIATI DOPPI VETRI STRATIFICATI, E SARANNO INOLTRE RISPONDENTI ALLA VIGENTE NORMATIVA ANTINCENDIO ED A QUELLA IN MATERIA DI RISPARMIO ENERG (Italian)
    0 references
    THE INTERVENTIONS AIM AT IMPROVING THE ENERGY PERFORMANCE AND COMFORT OF THE SCHOOL COMPLEX. IT IS ALSO ASSUMED TO ACHIEVE SIGNIFICANT ECONOMIC SAVINGS IN RELATION TO THE PURCHASE OF METHANE GAS, I.E. THE FUEL POWERING THE POWER PLANT. THE INTERVENTIONS WILL BE DIVIDED INTO TWO HOMOGENEOUS FUNCTIONAL LOTS: ONE RELATING TO THE REPLACEMENT OF THE FIXTURES AND THERMAL INSULATION OF THE SUBSYSTEM, THE OTHER RELATING TO THE REPLACEMENT OF HEAT GENERATORS WITH CONDENSING GENERATORS AND THE INSTALLATION OF REMOTE MANAGEMENT AND REMOTE CONTROL SYSTEMS IN RECMOTO.LOT 1 NEW FIXTURES WILL BE BUILT USING EXISTING TECHNOLOGY INSTEAD OF THE OLD ONES BUILT TO PI? OVER THE LIFETIME OF THE BUILDING, IN DIFFERENT MATERIALS AND GLASS, THE NEW WINDOWS WILL BE MADE OF RIGID PVC WHICH WILL BE COMBINED WITH DOUBLE GLAZING AND WILL ALSO COMPLY WITH THE LEGISLATION IN FORCE ON FIRE AND ENERGY SAVINGS (English)
    0 references

    Identifiers