CONSOLIDATION WORKS UPSTREAM OF BUILT-UP AREAS (Q2051756)
Jump to navigation
Jump to search
Project Q2051756 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | CONSOLIDATION WORKS UPSTREAM OF BUILT-UP AREAS |
Project Q2051756 in Italy |
Statements
250,000.0 Euro
0 references
500,000.0 Euro
0 references
50.0 percent
0 references
30 June 2017
0 references
30 December 2019
0 references
COMUNE DI URZULEI
0 references
IL PROGETTO HA L¿OBIETTIVO DI METTERE IN SICUREZZA ALCUNI VERSANTI A MONTE DELL¿ABITATO DI URZULEI MEDIANTE L¿INSTALLAZIONE DI NUOVE BARRIERE PARAMASSI, LA REALIZZAZIONE DI UN SISTEMA DI RACCOLTA DELLE ACQUE BIANCHE E IL DISGAGGIO E LA STABILIZZAZIONE DI MASSI. à PREVISTA INOLTRE LA SISTEMAZIONE DEL RIO SA PEDRA LADA E IL RIFACIMENTO DELL¿ATTRAVERSAMENTO DEL RIO NURALÊ SULLA VIA SASSARI. (Italian)
0 references
THE OBJECTIVE OF THIS PROJECT WAS TO MAKE SURE THAT A NUMBER OF SLOPES UPSTREAM OF THE BUILT-UP AREA OF URZUZLEI WILL BE PUT IN SAFETY THROUGH THE CREATION OF NEW ANCHOR BARRIERS, THE IMPLEMENTATION OF A WHITE WATER COLLECTION SYSTEM AND THE DISGAGGIO AND THE STABILISATION OF ROCKS. IT WILL ALSO PROVIDE FOR THE ACCOMMODATION OF RIO SA PEDRA LADA AND THE OVERHAUL OF THE RIO URARALÊ OVER THE ROUTE OF SASSARI. (English)
0 references
Identifiers
C47B17000100006
0 references