SILENT CAB ON FREE FLOAT AND DECOUPLED BRIDGES (Q2034317)
Jump to navigation
Jump to search
Project Q2034317 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | SILENT CAB ON FREE FLOAT AND DECOUPLED BRIDGES |
Project Q2034317 in Italy |
Statements
88,949.74 Euro
0 references
177,899.37 Euro
0 references
50.0 percent
0 references
10 November 2017
0 references
30 June 2021
0 references
CSNI - CONSORZIO SERVIZI NAVALI E INDUSTRIALI - SOCIETA' A RESPONSABILITA' LIMITATA
0 references
IL PROGETTO INTENDE SVILUPPARE I CALCOLI E LE ESPERIENZE PER L¿IDEAZIONE DI SISTEMI E METODI CHE CONSENTANO DI ALLESTIRE CABINE PREFABBRICATE COMPRENSIVE DI PAVIMENTAZIONI FLOTTANTI, INTEGRANDO I PROCESSI DI INSTALLAZIONE DELLE CABINE CON QUELLI DI ASSEMBLAGGIO DEI PUNTELLI DEI PONTI E UTILIZZANDO I PIù AVANZATI DISPOSITIVI DI DISACCOPPIAMENTO STRUTTURALE PER OTTIMIZZARE IL COMFORT VIBRO-ACUSTICO, CON L¿OBIETTIVO DI ABBATTERE I COSTI DI PRODUZIONE GARANTENDO ANCHE UNA MAGGIORE ECO-SOSTENIB (Italian)
0 references
THE AIM OF THE PROJECT IS TO DEVELOP CALCULATIONS AND EXPERIENCE FOR THE DESIGN OF SYSTEMS AND METHODS FOR BUILDING PREFABRICATED CABINS INCLUDING FLOATING FLOORS, INTEGRATING THE INSTALLATION OF THE BOOTHS WITH THE ASSEMBLY OF DECKS AND USING THE ADVANCED SYSTEM OF STRUCTURAL DECOUPLING TO OPTIMISE THE VARRO-ACUSTICO, WITH A VIEW TO REDUCING PRODUCTION COSTS AND ENSURING GREATER ECO-LALITY. (English)
0 references
Identifiers
D43D19000050007
0 references