ENERGY EFFICIENCY OF A CLOSED IPES BUILDING, VIA SEEBGG 30 (Q2022809)

From EU Knowledge Graph
Revision as of 06:18, 2 November 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q2022809 in Italy
Language Label Description Also known as
English
ENERGY EFFICIENCY OF A CLOSED IPES BUILDING, VIA SEEBGG 30
Project Q2022809 in Italy

    Statements

    0 references
    106,165.0 Euro
    0 references
    249,800.0 Euro
    0 references
    42.5 percent
    0 references
    17 November 2015
    0 references
    28 February 2018
    0 references
    ISTITUTO PER L'EDILIZIA SOCIALE DELLA PROVINCIA AUTONOMA DI BOLZANO
    0 references
    0 references
    0 references

    46°29'53.20"N, 11°21'17.21"E
    0 references
    L¿EDIFICIO RESIDENZIALE é DI PROPRIETà DELL' IPES E CONSTA DI 3 ALLOGGI. AL PIANO INTERRATO CI SONO LE CANTINE E I VANI TECNICI; AL PIANO TERRA E AL PRIMO PIANO SONO DISTRIBUITI I 3 ALLOGGI, UNO DEI QUALI DUPLEX.\NL¿EDIFICIO HA PIù DI 30 ANNI. IL PROGETTO DI RISANAMENTO PREVEDE PRINCIPALMENTE LA RIQUALIFICAZIONE ENERGETICA DELL¿EDIFICIO.\NNEL DETTAGLIO SARANNO EFFETTUATI I SEGUENTI LAVORI:\N- APPLICAZIONE DELLA COIBENTAZIONE SUI MURI PERIMETRALI\N- COIBENTAZIONE DEL SOLAIO DI CANTINA E DELL¿ULTIMO SOLAIO SOTTO IL TETTO\N- COIBENTAZIONE DEI BALCONI E RINNOVO DELLA PAVIMENTAZIONE\N- ADEGUAMENTO DELLE ALTEZZE DEI PARAPETTI (BALCONI, SCALE)\N- SOSTITUZIONE DEI SERRAMENTI, DELLE PORTE D¿INGRESSO E DEI PORTONI DEL GARAGE\N- MONTAGGIO DELLA LINEA VITA SULLA COPERTURA\N- ADATTAMENTO DELL¿IMPIANTO ELETTRICO E MONTAGGIO DI UN IMPIANTO SATELLITARE CENTRALIZZATO\N- LAVORI DI MANUTENZIONE ESTERNI: RINNOVO DEL MANTO DI CUBETTI NEL CORTILE E ELIMINAZIONE DI BARRIERE ARCHITETTONICHE (P.E. SOG (Italian)
    0 references
    MY RESIDENTIAL BUILDINGS WILL BE OWNED BY THE IPES AND CONSIST OF 3 DWELLINGS. THE BASEMENT IS RESPONSIBLE FOR THE CELLARS AND THE TECHNICAL ROOMS; ON THE GROUND FLOOR AND THE FIRST FLOOR, THE 3 HOUSING UNITS ARE DISTRIBUTED, ONE OF WHICH IS A DUPLEX. THE CONSOLIDATION PLAN MAINLY INCLUDES THE ENERGY RENOVATION OF THE BUILDING.\ NIN DETAIL, THE FOLLOWING WORKS WILL BE CARRIED OUT:\ N- APPLICATION OF THE PERIMETER WALLS\ N- INSULATION OF THE WINE CELLAR AND OF THE LAST SOLDER UNDER THE ROOF\ N- INSULATION OF BALCONIES AND RENOVATION OF THE HEIGHT OF RAILINGS (BALCONIES, STAIRCASES)\ N- ADAPTATION OF THE HEIGHT OF THE GUARD RAILS (BALCONIES, STAIRCASES)\ N- REPLACEMENT OF WINDOW AND DOOR FRAMES ON THE FRONT LINE ON THE COVERAGE\ N- ADAPTATION OF THE ELECTRICAL INSTALLATION AND INSTALLATION OF A CENTRALISED SATELLITE SYSTEM\ N- MAINTENANCE WORK: RENEWAL OF CUBES IN THE COURTYARD AND ELIMINATION OF ARCHITECTURAL BARRIERS (P.E. SOG (English)
    0 references

    Identifiers

    E19F14000040003
    0 references