DIRECTOR CASTROCUCCO-EABOLI (Q2021713)

From EU Knowledge Graph
Revision as of 04:39, 2 November 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q2021713 in Italy
Language Label Description Also known as
English
DIRECTOR CASTROCUCCO-EABOLI
Project Q2021713 in Italy

    Statements

    0 references
    14,154,416.07 Euro
    0 references
    19,159,707.4 Euro
    0 references
    73.88 percent
    0 references
    21 September 2017
    0 references
    31 July 2020
    0 references
    TERNA - RETE ELETTRICA NAZIONALE
    0 references
    0 references

    39°59'48.12"N, 15°43'20.53"E
    0 references
    IL PRESENTE PROGETTO RIGUARDERà LA REALIZZAZIONE DI UN NUOVO ELETTRODOTTO A 150 KV IN CAVO INTERRATO PER COLLEGARE LA CABINA PRIMARIA DI MARATEA ALLA CENTRALE DI CASTROCUCCO. L'AREA DEL CILENTO Ê ALIMENTATA DALLE SE DI MONTECORVINO E ROTONDA, TRAMITE UN'ESTESA RETE AD ANELLO A 150 KV, LA QUALE, A CAUSA DELL'ELEVATO CONSUMO SOPRATTUTTO NEI PERIODI ESTIVI, Ê IMPEGNATA DA NOTEVOLI TRANSITI. TALE ASSETTO COMPORTA UN ELEVATO IMPEGNO DELLE TRASFORMAZIONI NELLE DUE STAZIONI E UN RISCHIO ELEVATO DI ENERGIA NON FORNITA IN CONDIZIONI DI MANUTENZIONE SU UN TRONCO DEL SUDDETTO ANELLO. AL FINE DI INCREMENTARE L'ADEGUATEZZA DEL SISTEMA E MIGLIORARE LA SICUREZZA DI ESERCIZIO DELLA TRASMISSIONE Ê PROGRAMMATA LA REALIZZAZIONE DI UN NUOVO COLLEGAMENTO A 150 KV TRA LA C.LE DI CASTROCUCCO E LA SE DI MARATEA. TALE INTERVENTO CONSENTIRà UNA MIGLIORE GESTIONE DELLE MANUTENZIONI E UN MINORE RISCHIO DI DISALIMENTAZIONI. INOLTRE IL PRESENTE PROGETTO PREVEDE UNA SERIE DI INTERVENTI INNOVATIVI DI IMPLEMENTAZ (Italian)
    0 references
    THIS PROJECT WILL COVER THE CONSTRUCTION OF A NEW 150 KV POWER LINE IN BASEMENT TO CONNECT THE PRIMARY CABIN OF MARATEA TO THE CASTROCUCCO POWER STATION. THE CILENTO ÃO AREA, ON THE BASIS OF A WIDE NETWORK OF 150 KV RING, WHICH, BECAUSE OF HIGH CONSUMPTION DURING THE SUMMER PERIODS, HAS BEEN BUSY. THIS ARRANGEMENT INVOLVES A HIGH DEGREE OF COMMITMENT OF THE TRANSFORMATION IN THE TWO STATIONS AND A HIGH RISK OF ENERGY NOT BEING PROVIDED UNDER MAINTENANCE CONDITIONS ON A TRUNK OF THE ABOVE-MENTIONED RING. IN ORDER TO INCREASE THE ADEQUACY OF THE SYSTEM AND IMPROVE THE SAFE OPERATION OF THE TRANSMISSION, THE IMPLEMENTATION OF A NEW 150 KV CONNECTION BETWEEN THE PREMISES OF THE C.LE OF CASTELCUCCO AND THE IF OF MARATEA IS PLANNED. THIS WORK WILL IMPROVE MAINTENANCE MANAGEMENT AND A LOWER RISK OF DISEANS. IN ADDITION, THIS PROJECT PROVIDES FOR A SERIES OF INNOVATIVE ACTIONS TO BE MADE BY IMPLESMENTAZ (English)
    0 references

    Identifiers

    G23G17001520007