DIRECTOR CASTROCUCCO-EABOLI (Q2021713)

From EU Knowledge Graph
Revision as of 04:39, 2 November 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q2021713 in Italy
Language Label Description Also known as
English
DIRECTOR CASTROCUCCO-EABOLI
Project Q2021713 in Italy

    Statements

    0 references
    14,154,416.07 Euro
    0 references
    19,159,707.4 Euro
    0 references
    73.88 percent
    0 references
    21 September 2017
    0 references
    31 July 2020
    0 references
    TERNA - RETE ELETTRICA NAZIONALE
    0 references
    0 references

    39°59'48.12"N, 15°43'20.53"E
    0 references
    IL PRESENTE PROGETTO RIGUARDERà LA REALIZZAZIONE DI UN NUOVO ELETTRODOTTO A 150 KV IN CAVO INTERRATO PER COLLEGARE LA CABINA PRIMARIA DI MARATEA ALLA CENTRALE DI CASTROCUCCO. L'AREA DEL CILENTO Ê ALIMENTATA DALLE SE DI MONTECORVINO E ROTONDA, TRAMITE UN'ESTESA RETE AD ANELLO A 150 KV, LA QUALE, A CAUSA DELL'ELEVATO CONSUMO SOPRATTUTTO NEI PERIODI ESTIVI, Ê IMPEGNATA DA NOTEVOLI TRANSITI. TALE ASSETTO COMPORTA UN ELEVATO IMPEGNO DELLE TRASFORMAZIONI NELLE DUE STAZIONI E UN RISCHIO ELEVATO DI ENERGIA NON FORNITA IN CONDIZIONI DI MANUTENZIONE SU UN TRONCO DEL SUDDETTO ANELLO. AL FINE DI INCREMENTARE L'ADEGUATEZZA DEL SISTEMA E MIGLIORARE LA SICUREZZA DI ESERCIZIO DELLA TRASMISSIONE Ê PROGRAMMATA LA REALIZZAZIONE DI UN NUOVO COLLEGAMENTO A 150 KV TRA LA C.LE DI CASTROCUCCO E LA SE DI MARATEA. TALE INTERVENTO CONSENTIRà UNA MIGLIORE GESTIONE DELLE MANUTENZIONI E UN MINORE RISCHIO DI DISALIMENTAZIONI. INOLTRE IL PRESENTE PROGETTO PREVEDE UNA SERIE DI INTERVENTI INNOVATIVI DI IMPLEMENTAZ (Italian)
    0 references
    THIS PROJECT WILL COVER THE CONSTRUCTION OF A NEW 150 KV POWER LINE IN BASEMENT TO CONNECT THE PRIMARY CABIN OF MARATEA TO THE CASTROCUCCO POWER STATION. THE CILENTO ÃO AREA, ON THE BASIS OF A WIDE NETWORK OF 150 KV RING, WHICH, BECAUSE OF HIGH CONSUMPTION DURING THE SUMMER PERIODS, HAS BEEN BUSY. THIS ARRANGEMENT INVOLVES A HIGH DEGREE OF COMMITMENT OF THE TRANSFORMATION IN THE TWO STATIONS AND A HIGH RISK OF ENERGY NOT BEING PROVIDED UNDER MAINTENANCE CONDITIONS ON A TRUNK OF THE ABOVE-MENTIONED RING. IN ORDER TO INCREASE THE ADEQUACY OF THE SYSTEM AND IMPROVE THE SAFE OPERATION OF THE TRANSMISSION, THE IMPLEMENTATION OF A NEW 150 KV CONNECTION BETWEEN THE PREMISES OF THE C.LE OF CASTELCUCCO AND THE IF OF MARATEA IS PLANNED. THIS WORK WILL IMPROVE MAINTENANCE MANAGEMENT AND A LOWER RISK OF DISEANS. IN ADDITION, THIS PROJECT PROVIDES FOR A SERIES OF INNOVATIVE ACTIONS TO BE MADE BY IMPLESMENTAZ (English)
    0 references

    Identifiers

    G23G17001520007
    0 references