PORT OF TERMS IMERESE — DREDGING WORK OF THE PORT AT ALTITUDE — 10.00 L (Q2017475)

From EU Knowledge Graph
Revision as of 03:25, 2 November 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q2017475 in Italy
Language Label Description Also known as
English
PORT OF TERMS IMERESE — DREDGING WORK OF THE PORT AT ALTITUDE — 10.00 L
Project Q2017475 in Italy

    Statements

    0 references
    26,250,000.0 Euro
    0 references
    35,000,000.0 Euro
    0 references
    75.0 percent
    0 references
    1 January 2016
    0 references
    31 March 2022
    0 references
    ADSP DEL MARE DI SICILIA OCCIDENTALE
    0 references
    0 references

    37°59'1.14"N, 13°41'43.98"E
    0 references
    L'INTERVENTO DI DRAGAGGIO PREVEDE LA REALIZZAZIONE DELL'ESCAVO DEI FONDALI DEL PORTO PORTO DI TERMINI IMERESE FINO ALLA QUOTA DI - 10,00 M S.L.M.M. LA PRIMA FASE DEL DRAGAGGIO RIGUERDERà LA RIMOZIONE DEL MATERIALE NON IDONEO ALL'IMMERSIONE IN MARE, MENTRE NELLA SECONDA FASE SARà ESEGUITO IL DRAGAGGIO DELLA RESTANTE PARTE CARATTERIZZATA DA CLASSE DI QUALITà A2 E A1E IL CONSEGUENTE VERSAMENTONEL SITO DI DEPOSIZIONE. PER LA PARTE CONTAMINATA, LE MODALITà DI DRAGAGGIO SARANNO DI TIPO SELETTIVO ESEGUITO TRAMITE BENNA ECOLOGICA. IL DRAGAGGIO DELLA RESTANT PARTE, DA ESEGUIRE AL TERMINE DELL'ESCAVO DEI SEDIMENTI NON IDONEI ALL'IMMERSIONE IN MARE, Ê PREVISTO MEDIANTE L'UTILIZZO DI UNA DRAGA A STRASCICO ASPIRANTE SEMOVENTE CON POZZO DI CARICO, TIPO TRAILING SUCTION HOPPER DREDGER (Italian)
    0 references
    FOLLOWING THE DREDGING OF THE SEABED IN THE PORT OF TERMS OF THE HARBOUR OF THE PORT OF IMERESE TO THE ALTITUDE OF — 10.00 M ASL, THE FIRST STEP IN THE DREDGING PROCESS, THE REMOVAL OF UNSUITABLE MATERIAL FOR SEAWATER AT SEA, WHILE IN THE SECOND PHASE THE DREDGING OF THE REMAINING QUALITY CLASS A2 AND A1E WILL BE CARRIED OUT BY THE RESULTING VERSAMENTOEL LAYING SITE. FOR THE CONTAMINATED PART, THE METHOD OF DREDGING WILL BE SELECTIVE IN A SELECTIVE WAY. THE DREDGING OF THE RELUCTANT PARTY, TO BE CARRIED OUT AFTER THE END OF THE NON-IMMERSIVE SEDIMENTS AT SEA, ENFORCED BY THE USE OF A SELF-PROPELLED TRAWLING DREDGER WITH A RIDE-ON LOAD, TYPE OF OPERATION HOPFOR DRDGER (English)
    0 references

    Identifiers

    I69B19000000006
    0 references