ACCELERATION OF THE ROUTE — ROUTE BIOCOCCA-ARGUS (Q2017425)

From EU Knowledge Graph
Revision as of 03:25, 2 November 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q2017425 in Italy
Language Label Description Also known as
English
ACCELERATION OF THE ROUTE — ROUTE BIOCOCCA-ARGUS
Project Q2017425 in Italy

    Statements

    0 references
    56,472,886.39 Euro
    0 references
    90,171,762.0 Euro
    0 references
    62.63 percent
    0 references
    1 January 2003
    0 references
    20 December 2022
    0 references
    RFI SPA - RETE FERROVIARIA ITALIANA
    0 references
    L'INTERVENTO Ê COSTITUITO DAL 1^ LOTTO FUNZIONALE BICOCCA ¿ AUGUSTA, CHE CORRISPONDE ALLA FASE 2 DEL GP. LA REALIZZAZIONE DELLA TRATTA BICOCCA ¿ AUGUSTA PREVEDE I SEGUENTI PRINCIPALI INTERVENTI: ¿7 VARIANTI DI TRACCIATO; ¿ADEGUAMENTI DELLE OPERE ESISTENTI PER GARANTIRE LA DURABILITà DELLE STESSE;¿RIPRISTINO DELLE OPERE DI REGIMENTAZIONE IDRAULICA (FOSSI DI GUARDIA, RECAPITI, ETC.);¿INTERVENTI DI STABILIZZAZIONE DELLE SCARPATE (CHIODATURE, MURI DI PLACCAGGIO, DISGAGGIO DI BLOCCHI DI PIETRA ETC);¿SOTTOPASSO, SCALE, RAMPE NELLA STAZIONE DI LENTINI;¿REALIZZAZIONE NEGLI IMPIANTI DI STAZIONE DEI TRONCHINI DI SICUREZZA; ¿REALIZZAZIONE NICCHIONI TECNOLOGICI ALL¿INTERNO DELLA GALLERIA VALSAVOIA; ¿ADEGUAMENTO AI REQUISITI MINIMI PREVISTI DAL D.M. 28/10/2005 ¿SICUREZZA NELLE GALLERIE FERROVIARIE¿ PER L¿ESISTENTE GALLERIA VALSAVOIA DI LUNGHEZZA PARI A 1519 M; ¿REALIZZAZIONE DI N. 3 NUOVI CAVALCAFERROVIA E N. 2 PONTI CANALI. INOLTRE, SONO PREVISTI INTERVENTI NEGLI IMPIANTI DI: S (Italian)
    0 references
    THE INTERVENTION WAS MADE UP OF THE 1 ^ BICOCCA FUNCTIONAL LOT — AUGUSTA — WHICH CORRESPONDS TO THE 2 PHASE OF THE PG. THE IMPLEMENTATION OF THE BICOCCA Â VIIAUGUSTA PROVIDES FOR THE FOLLOWING MAIN MEASURES: Â BECOMES 7 VARIANTS; Â — ADAPTATIONS TO EXISTING WORKS TO ENSURE THAT THE WORKS ARE CARRIED OUT IN ORDER TO ENSURE THAT THE WORKS ARE CARRIED OUT ELECTRONICALLY (SECURITY DITCHES, CONTACT DETAILS, ETC.); Â OF STABILISATION OF THE SLOPES (CURDLING, RUNNING WALLS, DISGAGGIO OF BLOCK OF STONE ETC); Â OF THE UNDERPASS, STAIRS, RAMPS IN THE LENTINI STATION; Â TO BE CARRIED OUT IN THE STATION STATIONS FOR THE SAFETY RINGS; Â BECOMES A NICCHIPNOHIPRONIC TECHNOLOGY ATTACHMENT TO THE INTERIOR OF THE VALSAVOIA TUNNEL; Â TO ADAPT TO THE MINIMUM REQUIREMENTS LAID DOWN IN MINISTERIAL DECREE NO 28/10/2005 Â IN THE FERROVIIESREALM OF THE EXISTING VALSAVAI TUNNELS OF 1 519 M IN LENGTH. Â TOWARDS THE REALISATION OF N. 3 NEW RAIL AND N. 2 CANAL BRIDGES. THERE WILL ALSO BE INTERVENTIONS IN THE FOLLOWING PLANTS: S (English)
    0 references

    Identifiers

    J11H03000150001
    0 references