Terrestrial installation with a power of 39,44 kW “COD POL” EXPORT IMPORT CAZIMIERZ DZUDZEWICZ (Q137731)

From EU Knowledge Graph
Revision as of 20:07, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q137731 in Poland
Language Label Description Also known as
English
Terrestrial installation with a power of 39,44 kW “COD POL” EXPORT IMPORT CAZIMIERZ DZUDZEWICZ
Project Q137731 in Poland

    Statements

    0 references
    169,116.23 zloty
    0 references
    40,587.90 Euro
    13 January 2020
    0 references
    198,960.28 zloty
    0 references
    47,750.47 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 May 2018
    0 references
    30 September 2018
    0 references
    "COD ­ POL" EXPORT ­IMPORT KAZIMIERZ DZUDZEWICZ
    0 references
    0 references
    Projekt stacjonarny, dotyczy budowy mikroinstalacji fotowoltaicznej na gruncie o mocy 39,44 kW z wykorzystaniem najlepszych dostępnych technologii. Inwestycja wpłynie na zmniejszenie zanieczyszczenia powietrza w regionie, redukcję emisję Co2 oraz na zmianę bilansu energetycznego. Zgodnie z wstępnymi szacunkami, Wnioskodawca będzie mógł w stanie uzyskać do 36,254kWh rocznie zielonej energii, którą planuje sprzedać do sieci. Dzięki temu zostaną wykorzystane zasoby Wnioskodawcy oraz posiadana moc przyłączeniowa. Wnioskodawca zabezpieczył środki własne oraz dysponuje dokumentacją techniczną. Inwestor posiada prawo do dysponowania nieruchomością na cele budowlane. Etapy realizacji: faza przygotowawcza ( uzyskana gotowość formalno­prawna), do realizacji wyłonienie wykonawcy . Realizacja rzeczowa oraz podłączenie do OSD IV.kw 2017 r (Polish)
    0 references
    The stationary project concerns the construction of photovoltaic micro-installation on land with a power of 39.44 kW using the best available technologies. The investment will reduce air pollution in the region, reduce CO2 emissions and change the energy balance. According to preliminary estimates, the applicant will be able to obtain up to 36,254 kWh per year the green energy he plans to sell to the grid. As a result, the applicant’s resources and the connection power will be used. The applicant has secured own resources and has technical documentation. The investor has the right to dispose of the property for construction purposes. Stages of implementation: preparatory phase (formal preparedness), to implement the selection of the contractor. Implementation in kind and connection to OSD IV.kw 2017 (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.02.10.00-32-B018/17
    0 references