Photovoltaic installations with a renewable energy source for the EURO-clinker ANDRZEJ Dąbski RYSZARD Staniak SP. J. in Szczecin (Q137692)

From EU Knowledge Graph
Revision as of 20:07, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q137692 in Poland
Language Label Description Also known as
English
Photovoltaic installations with a renewable energy source for the EURO-clinker ANDRZEJ Dąbski RYSZARD Staniak SP. J. in Szczecin
Project Q137692 in Poland

    Statements

    0 references
    341,582.7 zloty
    0 references
    81,979.85 Euro
    13 January 2020
    0 references
    401,862.0 zloty
    0 references
    96,446.88 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 May 2016
    0 references
    31 March 2018
    0 references
    "PRZEDSIĘBIORSTWO HANDLOWO-USŁUGOWE EURO-KLINKIER" ANDRZEJ DĄBSKI RYSZARD STANIAK SPÓŁKA JAWNA
    0 references
    0 references
    Realizacja projektu polega na zainstalowaniu dwóch instalacji fotowoltaicznych na dachach budynków, w dwóch lokalizacjach, w których Wnioskodawca prowadzi swoją działalność gospodarczą, o mocy 38,3 kWp oraz 19,5 kWp. Instalacje dostarczą firmie alternatywne, odnawialne źródło energii elektrycznej. Głównym celem realizacji projektu jest wykorzystanie instalacji fotowoltaicznej jako alternatywnego źródła energii elektrycznej na potrzeby funkcjonowania przedsiębiorstwa. Cel ten zostanie osiągnięty poprzez realizację następujących działań: 1. Prace przygotowawcze (dokumentacja dotycząca studium wykonalności, dwa projekty instalacji). 2. Zakup środków trwałych - instalacji fotowoltaicznej w lokalizacji przy ulicy Obotryckiej, w skład której wchodzą: - 150 sztuk paneli fotowoltaicznych o mocy 265 W, - 2 sztuki inwertera, - 600 metrów przewodu solarnego, - 1 system montażowy, - 8 szt. ochrony przepięciowej, 3. Zakup środków trwałych - instalacji fotowoltaicznej w lokalizacji przy ulicy Pyrzyckiej, w skład której wchodzą: - 75 sztuk paneli fotowoltaicznych o mocy 265 W, - 1 sztuka inwertera, - 400 metrów przewodu solarnego, - 1 system montażowy, - 4 szt. ochrony przepięciowej, 4. Promocja projektu (tablica, oznakowanie, info na stronie www). Bezpośrednio po zakończeniu realizacji projektu, możliwe będzie w pełni korzystanie z wytworzonych w wyniku jego realizacji produktów. Realizacja projektu będzie trwała od II kwartału 2016 (prace przygotowawcze - rozpisanie studium wykonalności) do końca II kwartału 2017. Do uruchomienia instalacji fotowoltaicznych nie są konieczne żadne pozwolenia ani zgłoszenia budowlane, a także innego typu zezwolenia. Całkowity koszt inwestycji 506 760,00 zł brutto, a wartość kosztów kwalifikowanych to 412 000,00 zł. Projekt ma charakter stacjonarny i posiada dwie lokalizacje w Szczecinie - ul. Obotrycką oraz ulicę Pyrzycką. (Polish)
    0 references
    The project consists of the installation of two photovoltaic installations on the roofs of buildings, in two locations where the applicant conducts his business activity, with a capacity of 38.3 kWp and 19.5 kWp. The installations will provide the company with an alternative renewable source of electricity. The main objective of the project is to use photovoltaic installations as an alternative source of electricity for the operation of the company. This objective will be achieved through the implementation of the following actions: 1. Preparatory work (documentation on feasibility study, two installation projects). 2. Purchase of fixed assets – photovoltaic installation in the location on Obotrycka Street, which includes: — 150 units of photovoltaic panels with a capacity of 265 W, – 2 pieces of inverter, – 600 meters of solar wire, – 1 mounting system, – 8 units of overvoltage protection, 3. Purchase of fixed assets – photovoltaic installation in the location on Pyrzycka Street, which includes: — 75 units of photovoltaic panels with a capacity of 265 W, – 1 piece of inverter, – 400 meters of solar wire, – 1 mounting system, – 4 units of overvoltage protection, 4. Promotion of the project (table, marking, info on the website). Immediately after the completion of the project, it will be possible to make full use of the products produced as a result of its implementation. The project will be implemented from the second quarter of 2016 (preparatory work – feasibility study) to the end of the second quarter of 2017. No permits or construction declarations, as well as any other type of permit, are required to launch photovoltaic installations. The total investment cost of PLN 506 760.00, and the value of eligible costs is PLN 412 000.00. The project has a stationary character and has two locations in Szczecin – ul. Obotrycka Street and Pyrzycka Street. (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.02.10.00-32-A048/16
    0 references