Comprehensive energy modernisation of the School Complex building in Siekierki Wielkie in Kostrzyn commune (Q134843)

From EU Knowledge Graph
Revision as of 20:04, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q134843 in Poland
Language Label Description Also known as
English
Comprehensive energy modernisation of the School Complex building in Siekierki Wielkie in Kostrzyn commune
Project Q134843 in Poland

    Statements

    0 references
    671,951.18 zloty
    0 references
    161,268.28 Euro
    13 January 2020
    0 references
    790,530.8 zloty
    0 references
    189,727.39 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 September 2016
    0 references
    22 December 2017
    0 references
    GMINA KOSTRZYN
    0 references
    0 references
    Przedmiotem projektu jest modernizacja energetyczna budynku Zespołu Szkół w Siekierkach Wielkich (od 1.09.2017 będzie nazwany Szkołą Podstawową). Jest to budynek wolnostojący, zbudowany w technologii tradycyjnej. W budynku znajduje się mieszkanie (koszty z tym związane zostały wydzielone jako niekwalifikowane).Budynek jednocześnie podlegał rozbudowie o nową część. Kosztów rozbudowy nie uwzględniono w kosztach projektu, jedynie w zakresie instalacji CO (w tym modernizacja kotłowni i montaż pomp ciepła) - wydzielono koszty niekwalifikowane proporcjonalnie do powierzchni nowego budynku.Projekt zrealizowany zostanie na terenie miejscowości Siekierki Wielkie (powiat poznański, woj. wlkp.). Beneficjentem końcowym projektu jest gmina Kostrzyn. Beneficjentami ostatecznymi do których skierowany jest niniejszy projekt, będą wszyscy mieszkańcy gminy, powiatu poznańskiego oraz całego regionu dla których realizacja inwestycji oznaczać będzie poprawę stanu środowiska naturalnego. Ponadtobeneficjentami projektu będą uczniowie i pracownicy korzystający z obiektu przewidzianego do termomodernizacji.Szacuje się, iż z obiektu korzysta dziennie ok. 291 osób.Zakres prac związanych z termomodernizacją obejmie następujące przedsięwzięcia (realizacja w zakresie określonym w audycie – str. 51: pkt. 7.2 "Dokumentacja wybranego wariantu przedsięwzięcia termomodernizacyjnego"):- Ocieplenie stropodachu, - Ocieplenie stropu, - Ocieplenie dachu, - Wentylacja hybrydowa, - Ocieplenie ścian zewnętrznych, - Wymiana stolarki drzwiowej i okiennej, - Wentylacja za pomocą aparatów grzewczowentylacyjnych- Wymiana instalacji centralnego ogrzewania wraz z modernizacją kotłowni i montażem pompy ciepła. Produktami projektu będą (2017 r.):Liczba zmodernizowanych energetycznie bud. – 1 szt.Pow. użytkowa bud.poddanych termomodernizacji - 1.175,75 m2Liczba zmodernizowanych źródeł ciepła - 1 szt.Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE - 1 szt. (Polish)
    0 references
    The subject of the project is the energy modernisation of the building of the School Complex in Siekierki Wielkie (since 1.09.2017 will be called the Primary School). It is a free-standing building built in traditional technology. In the building there is an apartment (costs related to this were separated as ineligible).The building was also under construction with a new part. The costs of expansion were not included in the project costs, only in terms of the CO installation (including modernisation of the boiler room and installation of heat pumps) – costs ineligible in proportion to the surface of the new building were allocated.The project will be carried out in the area of Siekierki Wielkie (Poznañ County, Wlkp.). The final beneficiary of the project is Kostrzyn Municipality. The final beneficiaries to whom this project is addressed will be all residents of the commune, Poznań County and the entire region for whom the implementation of the investment will mean improvement of the environment. In addition, the beneficiaries of the project will be students and employees using the facility for thermal modernisation.It is estimated that the facility uses approx. 291 people.The scope of work related to thermal modernisation will cover the following projects (implementation within the scope specified in the audit – p. 51: it’s a point. 7.2 “Documentation of the chosen variant of the thermo-modernisation project”):- Warming of the ceiling, – Floor warming, – Roof warming, – Hybrid ventilation, – Warming of external walls, – Replacement of door and window joinery, – Ventilation using heating units- Replacement of central heating systems with the modernisation of the boiler room and installation of heat pump. The project’s products will be (2017):Number of energy upgraded buildings. — 1 units Useful buildings undergoing thermal modernisation – 1.175.75 m2Number of modernised heat sources – 1 units Number of built units of heat generation from RES – 1 pieces. (English)
    21 October 2020
    0 references

    Identifiers

    RPWP.03.02.03-30-0011/17
    0 references