Construction of bicycle roads in the municipality of Kołbaskowo in order to obtain transport accessibility and improve safety within the metropolitan area – stage II (Q137554)

From EU Knowledge Graph
Revision as of 20:00, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q137554 in Poland
Language Label Description Also known as
English
Construction of bicycle roads in the municipality of Kołbaskowo in order to obtain transport accessibility and improve safety within the metropolitan area – stage II
Project Q137554 in Poland

    Statements

    0 references
    4,500,000.0 zloty
    0 references
    1,080,000.0 Euro
    13 January 2020
    0 references
    5,641,090.7 zloty
    0 references
    1,353,861.77 Euro
    13 January 2020
    0 references
    79.77 percent
    0 references
    27 May 2019
    0 references
    31 December 2020
    0 references
    GMINA KOŁBASKOWO
    0 references
    Analizowane przedsięwzięcie pn.: „Budowa dróg rowerowych na terenie Gminy Kołbaskowo w celu uzyskania dostępności komunikacyjnej i poprawy bezpieczeństwa w ramach obszaru metropolitalnego- etap II” obejmuje swoim zakresem: 1. ODCINEK KARWOWO-PRZECŁAW: 1.1. budowa drogi gminnej o dł. 126 m, 1.2. budowa drogi pieszo-rowerowej o szer. 3 m od i dł. 2504 m., 2. ODCINEK KAMIENIEC-KOŁBASKOWO: 2.1. budowa ścieżki pieszo-rowerowej o szer. 3 m i dł. 1700 m, 2.2. przebudowa drogi gminnej wew. o dł. 398,57 m. - - - Etapy realizacji: * ODC. KARWOWO-PRZECŁAW: - Wybór Wykonawcy dokumentacji projektowej oraz robót w formule „zaprojektuj i wybuduj”: 2 kw. 2019, - Dokumentacja projektowo-wykonawcza: 2 kw. 2019 – 1 kw. 2020, - Usługa Nadzór Inwestorski [koszt poza projektem]: 2 – 4 kw. 2020, - Roboty budowlane: 2 – 4 kw. 2020, - Promocja projektu [koszt poza projektem]: 4 kw. 2020, - Odbiór końcowy: 4 kw. 2020. * ODC. KAMIENIEC-KOŁBASKOWO: - Wybór Wykonawcy prac budowlanych: 2 kw. 2019, - Usługa Nadzór Inwestorski [koszt poza projektem]: 2 – 4 kw. 2019, - Roboty budowlane: 2 – 4 kw. 2019, - Promocja projektu [koszt poza projektem]: 4 kw. 2020, - Odbiór końcowy: 4 kw. 2019. - - - Wnioskodawca posiada w ramach opisanych struktur majątkowo-administracyjnych zasoby techniczne, kadrowe i wiedzę gwarantujące uruchomienie infrastruktury bezpośrednio po zakończeniu projektu (SW 3.2). Projekt będzie realizowany za pomocą Zespołu ds. Wdrażania Projektu oraz podmiotów zew. (SW 3.2.2) - - - Zgodność projektu z zapisami pkt 1.2 Regulaminu naboru: - typ projektu – 1, - inwestycja wskazana w Strategii i wdrażana na obszarze ZIT SOM, - wsparcie na działania usprawniające komunikację publiczną, - dotyczy obszaru, dla którego stworzony został PGN oraz PZMM (SW 2.2.7), - przedmiot projektu znajduje się na terenie strefy przemysłowej, - inwestycja powiązana z działaniami „miękkimi” w ramach PGN. (Polish)
    0 references
    Analysed project called: ‘Construction of bicycle roads in the municipality of Kołbaskowo in order to obtain transport accessibility and improve safety within the metropolitan area – stage II’ includes: 1. KARWOWO-PRZECŁAW SECTION: 1.1. construction of the municipal road by length. 126 m, 1.2. construction of a walking-bike road about wide. 3 m from and long. 2504 m, 2. SECTION OF KAMIENIEC-KOŁBASKOWO: 2.1. construction of a walking-bike path by wide. 3 m long. 1700 m, 2.2. reconstruction of the communal road. 398.57 m. – - – The stages of implementation: * PC. C. KARWOWO-PRZECŁAW: — Selection of the Contractor of design documentation and works under the formula “design and build”: 2 sq. m. 2019, – Documentation of design and execution: 2 sq. m. 2019-1 sq. m. 2020, – Investor Oversight Service [cost outside the project]: 2-4 sq. m. 2020, – Construction works: 2-4 sq. m. 2020, – Promotion of the project [cost outside the project]: 4 sq. m. 2020, – Final reception: 4 sq. m. 2020. * PC. C. KAMIENIEC-KOŁBASKOWO: — Choice of Construction Workers: 2 sq. m. 2019, – Investor Oversight Service [cost outside the project]: 2-4 sq. m. 2019, – Construction works: 2-4 sq. m. 2019, – Promotion of the project [cost outside the project]: 4 sq. m. 2020, – Final reception: 4 sq. m. 2019. — – - The applicant has, within the framework of the structures described, technical and administrative resources, staffing and knowledge to guarantee the commissioning of the infrastructure immediately after the completion of the project (SW 3.2). The project will be implemented with the help of the Team. Implementation of the Project and entities of the call. (SW 3.2.2) – - – Conformity of the project with the provisions of point 1.2 of the Rules of Procedure: — type of project – 1, – investment indicated in the Strategy and implemented in the area of ZIT SOM, – support for activities improving public communication, – concerns the area for which PGN and PZMM (SW 2.2.7) were created – the subject of the project is located in the industrial zone, – an investment linked to “soft” activities within PGN. (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.02.02.00-32-0004/19
    0 references