Increase the share of renewable energy sources in the overall energy balance of the Region through the construction of photovoltaic installations in educational facilities in the municipality of Małdyty (Q132116)

From EU Knowledge Graph
Revision as of 19:39, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q132116 in Poland
Language Label Description Also known as
English
Increase the share of renewable energy sources in the overall energy balance of the Region through the construction of photovoltaic installations in educational facilities in the municipality of Małdyty
Project Q132116 in Poland

    Statements

    0 references
    245,274.69 zloty
    0 references
    58,865.93 Euro
    13 January 2020
    0 references
    288,558.46 zloty
    0 references
    69,254.03 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    21 June 2018
    0 references
    28 September 2018
    0 references
    GMINA MAŁDYTY
    0 references

    53°55'13.1"N, 19°44'30.1"E
    0 references
    W gm.Małdyty obecnie energia odnawialna wykorzystywana jest w minimalnym zakresie. Dla dalszego rozwoju społ-gosp., zgodnie z zasadami zrównoważonego rozwoju konieczne jest ograniczenie emisji zanieczyszczeń, co jest możliwe właśnie poprzez zastosowanie OZE. Problem główny: niski poziom udziału odnawialnych źródeł energii w ogólnym bilansie energetycznym gm. Małdyty. Problemy szczeg: -konieczność zrównoważonego rozwoju gospodarczego gminy poprzez ograniczenie emisji zanieczyszczeń, -potrzeba obniżenia kosztów pozyskania energii elektrycznej, -ograniczone możliwości promocji gminy jako czystej ekologicznie, -konieczność wzrostu bezpieczeństwa energetycznego. Celem projektu jest budowa 4 instalacji fotowoltaicznych • Budowa instalacji fotowoltaicznych o mocy 8,1 kWp w Przedszkolu nr 1 w Małdytach • Budowa instalacji fotowoltaicznych o mocy 20,1 kWp w Zespole Szkół w Szymonowie • Budowa instalacji fotowoltaicznych o mocy 20,1 kWp w Gimnazjum w Małdytach • Budowa instalacji fotowoltaicznych o mocy 10,2 kWp w Przedszkolu Samorządowym w Dobrocinie. Instalacja fotowoltaiczna w Przedszkolu nr 1 w Małdytach: Moc generatora PV 8,1 kWp Spec. uzysk roczny 1 002,39 kWh/kWp Stosunek wydajności (PR) 86,7 % Energia oddana do sieci 8 019 kWh/rok Instalacja fotowoltaiczna w Zespole Szkół w Szymonowie: Moc generatora PV 20,1 kWp Spec. uzysk roczny 1 029,07 kWh/kWp Stosunek wydajności (PR) 88,2 % Energia oddana do sieci 20 581 kWh/rok Instalacja fotowoltaiczna w Gimnazjum w Małdytach: Instalacja PV Moc generatora PV 20,1 kWp Spec. uzysk roczny 1 014,86 kWh/kWp Stosunek wydajności (PR) 87,6 % Energia oddana do sieci 20 297 kWh/rok Instalacja fotowoltaiczna w Przedszkolu Samorządowym w Dobrocinie: Moc generatora PV 10,2 kWp Spec. uzysk roczny 994,45 kWh/kWp Stosunek wydajności (PR) 87,7 % Energia oddana do sieci 9 944 kWh/rok (Polish)
    0 references
    At present, small renewable energy is used to a minimum. For the further development of the community, in accordance with the principles of sustainable development, it is necessary to reduce emissions of pollutants, which is possible precisely through the use of RES. The main problem is: low share of renewable energy sources in the overall energy balance of Gm. Maldite. Problems in detail: —necessity of sustainable economic development of the municipality by reducing emissions of pollutants, -need to reduce the costs of obtaining electricity, -limited possibilities of promoting the municipality as clean, -necessity of increasing energy security. The aim of the project is to build 4 photovoltaic installations • Construction of 8.1 kWp photovoltaic installations in kindergarten no.1 in Małdyty • Construction of photovoltaic installations with a power of 20.1 kWp in the School Complex in Szymonów • Construction of photovoltaic installations with a capacity of 20.1 kWp in the Junior High School in Małdyty • Construction of 10.2 kWp photovoltaic installations in the Local Government Preschool in Dobrocin. Photovoltaic installation in Kindergarten No. 1 in Małdyty: Power generator PV 8.1 kWp Spec. annual yield 1002.39 kWh/kWp Capacity ratio (PR) 86,7 % Power delivered to the grid 8019 kWh/year Photovoltaic installation in the School Complex in Szymonów: Power generator PV 20,1 kWp Spec. annual yield 1029.07 kWh/kWp Capacity ratio (PR) 88,2 % Power delivered to the grid 20581 kWh/year Photovoltaic installation in Junior High School in Małdyty: PV Power PV 20.1 kWp Spec. annual yield 1014.86 kWh/kWp Performance ratio (PR) 87,6 % Power delivered to the network 20297 kWh/year Photovoltaic installation in the Local Government Preschool in Dobrocin: Power generator PV 10,2 kWp Spec. annual yield 994.45 kWh/kWp Capacity ratio (PR) 87,7 % Power delivered to the network 9944 kWh/year (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.01.00-28-0594/16
    0 references