Construction of the interchange centre in Załom with bus loop (Q137545)

From EU Knowledge Graph
Revision as of 19:36, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q137545 in Poland
Language Label Description Also known as
English
Construction of the interchange centre in Załom with bus loop
Project Q137545 in Poland

    Statements

    0 references
    2,700,000.0 zloty
    0 references
    648,000.0 Euro
    13 January 2020
    0 references
    3,714,134.76 zloty
    0 references
    891,392.34 Euro
    13 January 2020
    0 references
    72.7 percent
    0 references
    2 July 2018
    0 references
    28 June 2019
    0 references
    GMINA GOLENIÓW
    0 references
    Inwestycja zakłada budowę Centrum Przesiadkowego (CP) przy ul. Leśnej i Lubczyńskiej w Załomiu z zagospodarowaniem terenu i infrastrukturą techn. Zakres rzeczowy obejmuje m.in. budowę obiektu obsługi podróżnych (z poczekalnią, pokojem kierowców i toaletami) wraz z zadaszonym przejściem na perony i wiatami przystankowymi. W ramach prac w branży drogowej w CP powstanie plac manewrowy dla autobusów, P&R na 60 poj., (w tym 3 miejsca dla os. niepełnosprawnych), B&R na 18 rowerów oraz ścieżka pieszo-rowerowa i dojścia piesze do budynku obsługi. Poza tym powstaną przyłącza: wod-kan. i instalacje zewn.: wodna, kanalizacji san., elektryczna, teletechniczna i telekomunikacyjna oraz kanalizacja deszcz. Teren będzie oświetlony i monitorowany, a jako koszt NKW powstanie plac zabaw. (Polish)
    0 references
    The investment assumes the construction of the Interchange Centre (CP) at ul. Forest and Lubczyńska in Załomiu with land development and techn infrastructure. The material scope includes, among others, the construction of a passenger service facility (with a waiting room, driver’s room and toilets) with a covered passage to platforms and bus stops. As part of the work in the road industry in CP there will be a manoeuvring area for buses, P&R on 60, (including 3 seats for people with disabilities), B &R for 18 bicycles, and a foot-bike path and access to the service building. In addition, there will be connections: water-channel and outdoor installations: water, sanitary, electrical, telecommunication, and rain drainage. The area will be illuminated and monitored, and as a cost of NKW a playground will be created. (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.02.02.00-32-0002/17
    0 references