Extension of Voivodeship Road No. 194 Wyrzysk-Gołańcz in Wyrzysk (Q135163)

From EU Knowledge Graph
Revision as of 19:33, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q135163 in Poland
Language Label Description Also known as
English
Extension of Voivodeship Road No. 194 Wyrzysk-Gołańcz in Wyrzysk
Project Q135163 in Poland

    Statements

    0 references
    5,600,151.73 zloty
    0 references
    1,344,036.42 Euro
    13 January 2020
    0 references
    6,588,413.82 zloty
    0 references
    1,581,219.32 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 May 2016
    0 references
    31 December 2017
    0 references
    SAMORZĄD WOJEWÓDZTWA WIELKOPOLSKIEGO
    0 references
    0 references
    Projektowana inwestycja zlokalizowana jest w województwie wielkopolskim, w powiecie pilskim, w gminie Wyrzysk. Przedmiotem opracowania jest rozbudowa drogi wojewódzkiej nr 194 na odcinku długości 2 171,94 m w m. Wyrzysk. W chwili obecnej droga nr 194 na odcinku przejścia przez m. Wyrzysk wykazuje znaczną degradację. Na drodze ruch drogowy wstrzymywany jest przez zatrzymujące się na jezdni autobusy. Nawierzchnia charakteryzuje się złym stanem technicznym – występują deformacje, wyboje, spękania podłużne i poprzeczne, liczne ubytki i łaty. Istniejące chodniki są również w złym stanie technicznym. Brak funkcjonalnego systemu odwodnienia przyczynia się do pogarszania warunków bezpieczeństwa ruchu drogowego. Inwestycja obejmuje:- korektę geometrii drogi wojewódzkiej na skrzyżowaniu ul. Bydgoskiej z Staszica i Kościuszki,- rozbiórkę istniejącej i wykonanie nowej konstrukcji jezdni,- przebudowę – budowę chodników,- budowę nowych zatok autobusowych oraz przebudowę istniejących,- przebudowę skrzyżowań drogi wojewódzkiej z drogami gminnymi, powiatowymi (ulicami),- przebudowie zjazdów indywidualnych oraz publicznych w ciągu drogi wojewódzkiej – strona prawa i lewa,- budowie kanalizacji deszczowej w celu poprawy warunków odwodnienia,- wycince i zabezpieczeniu istniejących drzew i krzaków zlokalizowanych w śladzie projektowanej rozbudowy,- wykonaniu nowego oznakowania poziomego i pionowego,- usunięcie kolizji z istniejącą infrastrukturą techniczną,- remoncie istniejącego obiektu mostowego od km 0+374,04 do km 0+411,88,- budowie oświetlenia drogowego przy nowym rondzie,- przebudowie istniejącego przepustu w km 0+883,32. Projektowany zakres inwestycji zapewni odtworzenie istniejących połączeń drogowych i dojazd do wszystkich działek w liniach rozgraniczających. W wyniku zrealizowania inwestycji w roku 2017 przebudowanych zostanie 2 171,94 m drogi wojewódzkiej nr 194 i obiekty inżynieryjne przepust i obiekt mostowy. (Polish)
    0 references
    The project is located in Wielkopolskie Voivodship, Pilskie County, Wyrzysk commune. The subject of the study is the extension of the Voivodeship Road No. 194 on the length of 2171.94 m in Wyrzysk. At the moment, road No. 194 on the crossing section of Wyrzysk is showing significant degradation. On the road, traffic is stopped by bus stops on the road. The surface is characterised by poor technical condition – there are deformations, bumps, longitudinal and transverse cracks, numerous defects and patches. The existing pavements are also in poor technical condition. The lack of a functional dehydration system contributes to the deterioration of road safety conditions. The investment includes:- correction of the geometry of the provincial road at the intersection of ul. The construction of new bus bays and reconstruction of existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (streets),- reconstruction of the construction of individual and public exits in the course of the voivodeship road – reconstruction of the junction of the voivodship road,- construction of the rainwater drainage system in order to improve the construction of the existing drainage and construction of the existing 0 km of the construction of the original and the construction of the construction of the existing buildings – the right and left side,- construction of rainwater drainage in order to improve the conditions of drainage and repair of the existing ones,-- demolition of the existing buildings – the construction of rainwater drainage in order to improve the conditions of drainage and dehydration,- demolition of the existing one,- demolition of existing roads and construction of new roads,- reconstruction – construction of pavements,- construction of new bus bays and reconstruction of the existing,- reconstruction of the intersections of the voivodship road with municipal roads, district roads (street roads),- reconstruction of the construction of individual and public exits within the course of the voivodship road – the right and left side,- construction of rainwater drainage in order to improve the construction of the existing drainage and the construction of the existing 0 km of the construction of individual and public roads within the voivodeship road – left and left side,- construction of rainwater drainage in order to improve the drainage conditions and repairs of the existing ones,- the construction of the existing buildings – the right and the left, the construction of the rainwater drainage system in order to improve the conditions of drainage and the construction of the existing one-destruction,- the reconstruction of the existing buildings and the reconstruction of the intersections of the voivodship road with the municipal roads, the district road (street),- the renovation of the construction of the original and public exits in the course of the voivodship road – the right and the left,- construction of the rainwater drainage in the area in order to improve the drainage conditions of the existing one- and the construction of the existing one-section of the existing buildings – the right and the left, the construction of the rainwater drainage in order to improve the conditions of the drainage and the construction of the existing one,--cutting and cutting-out of the existing buildings – the construction of the new road and construction of the road,- reconstruction of the roadways, the construction of the pavements,- construction of new bus bays and reconstruction of existing buildings,- reconstruction of the intersections of the voivod The planned scope of the investment will ensure the reconstruction of existing road links and access to all plots of demarcation lines. As a result of the investment in 2017, 2171.94 m of voivodship road No. 194 and culverts and bridge structure will be rebuilt. (English)
    21 October 2020
    0 references

    Identifiers

    RPWP.05.01.01-30-0011/15
    0 references