Revitalisation of the historic tenement house at ul. 1 May 11 in Olsztyn through renovation (Q132710)

From EU Knowledge Graph
Revision as of 19:22, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q132710 in Poland
Language Label Description Also known as
English
Revitalisation of the historic tenement house at ul. 1 May 11 in Olsztyn through renovation
Project Q132710 in Poland

    Statements

    0 references
    751,470.82 zloty
    0 references
    180,353.00 Euro
    13 January 2020
    0 references
    1,130,014.32 zloty
    0 references
    271,203.44 Euro
    13 January 2020
    0 references
    66.5 percent
    0 references
    3 January 2014
    0 references
    31 December 2020
    0 references
    WSPÓLNOTA MIESZKANIOWA NIERUCHOMOŚCI 10-117 OLSZTYN, UL. 1 MAJA 11
    0 references
    0 references

    53°46'36.1"N, 20°28'40.1"E
    0 references
    Zakres proj. obejmuje 1 budynek wielorodz. położ. w Olsztynie przy ul. 1 Maja 11 o łącznej pow. użyt. 1024,78 m2. Budynek wpisany do rej. zabytków pod nr : A-1818. W wybranym do realiz. wariancie stanow. przedmiot niniejszego projektu nowa jakość budynku oraz przestrz. zostanie uzysk. poprzez następ. usprawn.: prace rem-kons elewacji, klatki schod., piwnicy, dachu, stolarki okiennej i drzwiow. klatki schod. i piwnic, wym. inst. wod.-kan. stan. część wspólną oraz przyłącza, inst. domof. z kodem Brailla, ośw. automat., ozn. kontrast., mont. budek ornit. Znaczna poprawa stanu zachow. budynku i jego efektyw. energet. (poprzez inst. czujek oszczędz. en. elektr. w częściach wspól. budynku) oraz estetyki. Zainst. zost. nakł. braile'a na domofon. Więcej w rozdz. 1.1 sw; Interesar. przedm. projektu są mieszkańcy kamienicy, a tym samym obszaru rewit., turyści, służby konserw., Gm. Olsztyn. Szczeg. inform. na temat zakresu rzecz. i przyjętych rozwiąz. znajduje się w rozdz. 2.2 sw. oraz w wyciągu z dokum. techn. będącej załączn. do wniosku. Cały zakres inw. wdraż. będzie przez beneficj., tj. Wsp. Mieszk. Nier. przy ulicy 1 Maja 11, która wraz z podm. współpr. zapewni zespół osób odpow. za wdroż. projektu, którzy posiadają kwalif. i doświad. w realiz. projektów , co potwierdza rozdział 2.4 studium. Projekt po jego zakoń. jednozn. rozw. jeden z istotn. probl. dotycz. najbardz. zniszcz. i zaniedb. infrastr. techn. przy ul. 1 Maja 11 w Olsztynie oraz będzie przeciwdz. margin. znacznych grup mieszk. zdegrad. społecz. i ekon, charakt. się zabytk. zabud. otoczenia. W istotny sposób przyczyni się także do społ. aktyw. mieszk. i wpłynie na obniż. poziomu wyst. zjawisk patol. społ. na danym terenie. Proj. wpis. się w założ. SZOOP RPO WiM 2014-2020, Oś 8 Obsz. wymag. rewit., Cel tem. 9 Prom. Włącz. Społ., walka z ubóstw. i wsz. dysk rym., Prior. Inwest. 9 b – Wsp. rewit. fizycz., gosp. i społ. ubogich społ.na obsz. miejs. i wiejsk., Cel szcz.: Lepsza jak. życia społ. zam. ob. probl. (Polish)
    0 references
    The scope of the project covers 1 multi-gene building in Olsztyn, ul. 1 May 11 with total area of use. 1024,78 m². Building entered in the district of monuments under no.: IT’S A-1818. In the state variant selected for the implementation, the subject of this project is a new quality of the building and overhaul will be yielded by the following: works of rem-cons of facades, staircases, basement, roof, window joinery and doors. staircases and cellars, e.g. inst. water.-can. state. common part and connections, inst. domof. with Brailla code, d.o.v. automatic., ozn. contrast., mont. booth ornit. Significant improvement in the condition of maintenance of the building and its efficiency. energet. (through the inst. sensor save en. electr. in parts of the building) and aesthetics. Zainst. zost. put Braile on the intercom. More in chapters. 1.1 sw; Interests. before the project are residents of the tenement house, and thus the area of revvit., tourists, canned service., Gm. Olsztyn. Detailed information on the scope of the item. and accepted solutions can be found in chapter. 2.2 St. and in the techn. document extract annexed to the application. The whole range of inw. implementation. will be through the benefice., i.e. I'm all right. It’s a bellow. Nier. at 1 Maja 11, which together with the co-author will provide a team of people responsible for the implementation of the project, who have qualified and testimonials in the implementation of projects, which is confirmed by chapter 2.4 of the study. Project after its end. one. development one of the essential tests concerning. most destruction and neglect infrastr. techn. at ul. 1 May 11 in Olsztyn and will be counter-margin. significant groups of inhabitants. degrade. society. and ekon, charakt. up monument. buildings. surroundings. It will also significantly contribute to the community’s inhabitant activity and will reduce the level of pathol phenomena in a given area. Proj. entry. make a bet. SZOOP RPO WiM 2014-2020, Axis 8 Application, rewit., Target tem. It’s 9 Prom. Turn it on. Socially, the fight against poverty and the rhyme disc, Prior. It’s an investment. 9 b – physicist, gossip and community of the poor on urban areas and villages, Goalszcz: It’s better than a social life. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.08.01.00-28-0002/18
    0 references