Development of part of plot no. 643/23 in Piecky for recreational and sports purposes (Q132679)

From EU Knowledge Graph
Revision as of 19:21, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q132679 in Poland
Language Label Description Also known as
English
Development of part of plot no. 643/23 in Piecky for recreational and sports purposes
Project Q132679 in Poland

    Statements

    0 references
    158,577.94 zloty
    0 references
    38,058.71 Euro
    13 January 2020
    0 references
    198,222.42 zloty
    0 references
    47,573.38 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    29 June 2017
    0 references
    15 August 2019
    0 references
    GMINA PIECKI
    0 references
    0 references

    53°44'57.1"N, 21°20'28.3"E
    0 references
    Przedmiotowy projekt realizowany będzie na terenie Gminy Piecki w miejscowości Piecki, działka ew. nr 643/23 (województwo warmińsko - mazurskie). Zakres inwestycji obejmuje utworzenie infrastruktury rekreacyjno-sportowej: 1. Utwardzenie powierzchni gruntu – ciągi pieszo – rowerowe o szerokości 2,5 m, wykonane z kostki betonowej, umożliwiające bezkolizyjne współużytkowanie przez pieszych, rowerzystów lub skaterów, a także niewielki plac wypoczynkowy (koszty ciągu rowerowego uwzględniono w kosztach niekwalifikowalnych); 2. Tor rowerowy pumptrack – będący formą utwardzenia powierzchni gruntu, zaprojektowano jednokierunkowy tor zamknięty o nawierzchni bitumicznej i szerokości 1,5 metra; 3. Elementy małej architektury: ławki z oparciem, ławka z rowerkami, kosze na odpadki, stojaki na rowery, stacjonarne rowerki do ćwiczeń wyposażone w ładowarki USB; 4. Prace ziemne w zakresie niwelacji terenu; 5. Prace ogrodnicze. Głównym problemem zidentyfikowanym na terenie Piecek w nawiązaniu do przedmiotowego projektu jest brak miejsca turystyczno-rekreacyjnego, przeznaczonego dla dzieci i młodzieży ale także dla osób dorosłych, które wpłynęłoby na zagospodarowanie czasu wolnego, uatrakcyjnienie i wzrost konkurencyjności turystycznej Gminy Piecki. W związku powyższym, projekt i jego cele są komplementarne i wpisują się w cel sformułowany w SZOOP dla Poddziałania 6.2.3. Efektywne wykorzystanie zasobów. Projekt realizowany będzie zgodnie ze schematem B – zagospodarowanie przestrzeni na cele turystyczno – rekreacyjne. Interesariuszami (beneficjentami) projektu i rezultatów powstałych w wyniku realizacji przedmiotowego projektu będą mieszkańcy Gminy Piecki oraz turyści odwiedzający Gminę. Etapy realizacji projektu to: przygotowanie dokumentacji, złożenie wniosku, realizacja prac budowlanych i promocja projektu, monitoring realizacji projektu, rozliczenie projektu, nadzór nad inwestycją i eksploatacja (Polish)
    0 references
    The project will be implemented in the Piecki commune in Piecki, plot no. 643/23 (Warmińsko-Mazurskie voivodship). The scope of the investment includes the establishment of recreational and sport infrastructure: 1. Hardening of the surface of the ground – on foot – bicycle tracks with a width of 2.5 m, made of concrete cube, allowing non-collision sharing by pedestrians, cyclists or skaters, as well as a small recreation area (costs of the cycle are included in ineligible costs); 2. The pumptrack cycle track, which is a form of hardening of the surface of the ground, has been designed a one-way closed track with bituminous surface and width of 1.5 metres; 3. Elements of small architecture: benches with backrest, bench with bicycles, waste baskets, bicycle stands, stationary exercise bikes equipped with USB chargers; 4. Earth work in the field of land levelling; 5. It’s a gardening job. The main problem identified in Piecek in relation to this project is the lack of a tourist and recreational place, intended for children and young people, but also for adults, which would affect leisure, attractiveness and increased tourist competitiveness of the Piecki Commune. Therefore, the project and its objectives are complementary and fall within the objective of the SZOOP for Sub-measure 6.2.3. Efficient use of resources. The project will be implemented in accordance with scheme B – development of space for tourism and recreational purposes. The stakeholders (beneficiaries) of the project and the results created as a result of the project will be residents of the Piecki Commune and tourists visiting the Municipality. The stages of the project are: preparation of documentation, submission of the application, implementation of construction works and project promotion, monitoring of project implementation, project settlement, supervision of the investment and operation (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.06.02.03-28-0043/17
    0 references