Investments in RES in the Wedding House POD with wings (Q131956)

From EU Knowledge Graph
Revision as of 19:01, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q131956 in Poland
Language Label Description Also known as
English
Investments in RES in the Wedding House POD with wings
Project Q131956 in Poland

    Statements

    0 references
    181,330.57 zloty
    0 references
    43,519.34 Euro
    13 January 2020
    0 references
    213,330.08 zloty
    0 references
    51,199.22 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    28 September 2016
    0 references
    30 November 2018
    0 references
    "POD SKRZYDŁAMI" DOM WESELNY-ZAJAZD-NOCLEGI ALEKSANDER BUKS
    0 references
    0 references

    54°15'44.3"N, 20°48'32.0"E
    0 references
    Wnioskodawca planuje przeprowadzić inwestycję polegającą na montażu instalacji paneli fotowoltaicznych w istniejącej infrastrukturze Wnioskodawcy w lokalizacji Wardomy 4, działka 12/44 gmina Bartoszyce. Przewidziano system fotowoltaiczny o mocy znamionowej 40 kWp składający się z 125 modułów o mocy jednostkowej 320Wp, podłączony do sieci dystrybucyjnej bezpośrednio do trójfazowej instalacji elektrycznej niskiego napięcia. Całość instalacji będzie posadowiona na budynku i będzie stanowiła integralną część obiektu, określana jako instalacja nadachowa. Przyłączenie do sieci odbywa się na podstawie zgłoszenia do danego operatora sieci w tym przypadku Energa Operator. Zgodnie z ustawą przyłączenie mikro-instalacji fotowoltaicznej do mocy i włącznie 40 kWp do sieci jest w obowiązku każdego operatora i nie wymaga pozwolenia na budowę. Etapy realizacji projektu: - złożenie wniosku o do?nansowanie - podpisanie umowy o do?nansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność ?rmy. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii (Polish)
    0 references
    The applicant plans to carry out an investment consisting of installation of photovoltaic panels in the existing infrastructure of the Applicant in the location of Wardom 4, plot 12/44 of Bartoszyce Municipality. A photovoltaic system with rated power of 40 kWp is provided, consisting of 125 modules with 320Wp unit power, connected to a distribution network directly to a three-phase low voltage electrical system. The entire installation will be positioned on the building and will form an integral part of the facility, referred to as a supervising installation. The connection to the network is based on a notification to the network operator in this case Energa Operator. According to the Act, the connection of a micro-voltaic installation to power and including 40 kWp to the network is required by each operator and does not require a construction permit. Stages of project implementation: — submission of an application for funding – signing of the contract for funding – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of works according to the established timetable – completion of the project and signing of the final protocol – the final settlement of the project The project fits into the assumptions entered in the Polish Shoop, fulfilling the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the company’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase the competitiveness of the company. As a result of the investment, energy consumption costs will fall (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.01.00-28-0342/16
    0 references