Construction of a 39.78 kW photovoltaic installation in Breidine. (Q131884)

From EU Knowledge Graph
Revision as of 18:55, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q131884 in Poland
Language Label Description Also known as
English
Construction of a 39.78 kW photovoltaic installation in Breidine.
Project Q131884 in Poland

    Statements

    0 references
    202,878.0 zloty
    0 references
    48,690.72 Euro
    13 January 2020
    0 references
    238,680.0 zloty
    0 references
    57,283.2 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    21 November 2016
    0 references
    11 January 2017
    0 references
    SPÓŁKA JAWNA "ŻWIREK" KATARZYNA SKWIOT, ADAM SKWIOT
    0 references
    0 references

    53°44'57.1"N, 21°20'28.3"E
    0 references
    Inwestycja objęta niniejszym projektem polega na zakupie i montażu naziemnej elektrowni fotowoltaicznej o mocy 39,78 kW w miejscowości Brejdyny 68, na działce nr 243 oraz 236/2. Projekt wpisuje się w typ projektu wymieniony w SzOOP dla działania 4.1 - instalacji wykorzystujących energię słońca - do 2 MWe/MWth. Instalacja zgodnie z możliwością opisaną w SzOOP będzie służyła potrzebom własnym przedsiębiorstwa i będzie podłączona do sieci, jednakże ze względu na moc instalacji (do 40 kW) zgodnie z art. 5 ustawy o odnawialnych źródłach energii (Dz.U. 2015 poz. 478) oraz Art. 7 ust. 8d ze znaczkiem 4-9 ustawy – Prawo energetyczne (Dz.U. Dz.U. 1997 nr 54 poz. 348) będzie ona dokonywana na podstawie zgłoszenia bez konieczności posiadania przez beneficjenta ważnych technicznych warunków przyłączenia wszystkich ujętych w projekcie źródeł wytwarzania energii do sieci elektroenergetycznej. Wnioskodawca posiada obecnie przyłącze gdzie moc umowna wynosi 100 kW. Projekt spełnia wszystkie warunki brzegowe określone w SzOOP RPO WiM 2014-2020. Inwestycja polega na montażu 153 paneli fotowoltaicznych (polikrystalicznych) o łącznej mocy 39,78 kW połączonych w samodzielne układy wraz z falownikami, z niezbędnym okablowaniem i osprzętem. Etapy projektu: zakup, montaż, rozliczenie. Panele fotowoltaiczne wykorzystują zjawisko fotowoltaiczne do przetwarzania promieniowania słonecznego na energię elektryczną. Za pomocą połączeń kablowych przekazują one energię do falowników, gdzie następuje zmiana prądu stałego w prąd zmienny. Elektrownia będzie podłączona do sieci, natomiast nie będzie potrzeby instalowania akumulatorów oraz regulatorów ładowania, ponieważ sieć jest w stanie przyjąć całą energię wyprodukowaną przez system fotowoltaiczny. Wyprodukowana energia elektryczna będzie wykorzystywana bezpośrednio na potrzeby własne a ewentualna nadwyżka będzie wprowadzona do sieci. (Polish)
    0 references
    The investment covered by this project consists of the purchase and installation of a 39.78 kW terrestrial photovoltaic power plant in Brejdyny 68, on plot No. 243 and 236/2. The project fits into the type of project mentioned in the SzOOP for action 4.1 – solar energy installations – up to 2 MWe/MWth. The installation according to the possibility described in the SzOOP will serve the company’s own needs and will be connected to the network, however due to the capacity of the installation (up to 40 kW) in accordance with Article 5 of the Renewable Energy Sources Act (Journal of Laws 2015 item. 478) and Article 7. 8d with stamp 4-9 of the Act – Energy Law (Journal of Laws, Journal of Laws 1997 No. 54, item. 348) it will be made on the basis of a notification without the beneficiary having to have important technical conditions for connecting all energy generation sources included in the project to the electricity grid. The applicant now has a connection with a contractual capacity of 100 kW. The project meets all the shore conditions specified in the SHOOP RPO WiM 2014-2020. The investment consists of mounting 153 photovoltaic (polycrystalline) panels with a total power of 39.78 kW connected to independent circuits with inverters, with the necessary wiring and fittings. Stages of the project: purchase, editing, billing. Photovoltaic panels use the photovoltaic phenomenon to convert solar radiation into electricity. By means of cable connections, they transmit energy to inverters, where the direct current changes to alternating current. The power plant will be connected to the grid, but there will be no need to install batteries and charge regulators, as the network is able to absorb all the energy produced by the photovoltaic system. The electricity produced will be used directly for own use and any surplus will be introduced into the grid. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.01.00-28-0270/16