Construction of sanitary sewage system and replacement of water supply from AC pipes with PE pipes in Parzymiechy – stage II (Q124220)

From EU Knowledge Graph
Revision as of 17:29, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q124220 in Poland
Language Label Description Also known as
English
Construction of sanitary sewage system and replacement of water supply from AC pipes with PE pipes in Parzymiechy – stage II
Project Q124220 in Poland

    Statements

    0 references
    999,982.8 zloty
    0 references
    239,995.87 Euro
    13 January 2020
    0 references
    2,426,553.76 zloty
    0 references
    582,372.9 Euro
    13 January 2020
    0 references
    41.21 percent
    0 references
    4 June 2019
    0 references
    28 December 2019
    0 references
    GMINA LIPIE
    0 references
    0 references

    51°0'45.7"N, 18°47'49.9"E
    0 references
    Projekt polega na budowie sieci kanalizacji sanitarnej oraz wymianie wodociągu z rur AC na rury PE w miejscowości Parzymiechy - w ramach II etapu kanalizacji niniejszej miejscowości. Przedsięwzięcie obejmuje: Zadanie 1. Roboty budowlane: kanalizacja sanitarna: - Sieć kanalizacji sanitarnej - Przyłącza kanalizacyjne - Rurociąg tłoczny - Przepompownia ścieków P3 - Roboty odtworzeniowe Zadanie 2. Roboty budowlane: wymiana wodociągu z rur AC na rury PE: - Sieć wodociągowa - Przepięcia przyłączy wodociągowych. W wyniku realizacji projektu ścieki z gospodarstw domowych będą odprowadzane do biologiczno - mechanicznej oczyszczalni ścieków, oddanej do użytku w 2005r. o przepust. 500 m3/dobę, zlokalizowanej w Lipiu. Po zakończeniu inwestycji zwiększy się udział ludności gminy Lipie korzystającej z systemu oczyszczania ścieków zgodnego z dyrektywą 91/271/EWG, a w konsekwencji nastąpi zmniejszenie zanieczyszczenia środowiska naturalnego (zwłaszcza wód). (Polish)
    0 references
    The project consists of building a sanitary sewer system and replacing the water supply from AC pipes with PE pipes in Parzymiechy – within the second stage of the sewerage of this town. The project shall include: Task 1. Construction work: sanitary sewerage: — Sewerage network – Sewerage connections – Pressure pipe – Waste pumping plant P3 – Reconstruction robots Task 2. Construction work: replacement of AC pipes with PE pipes: — Water supply network – Overvoltages of water connections. As a result of the project, household waste water will be discharged to a biological and mechanical sewage treatment plant, commissioned in 2005 for culverts. 500 m³/day, located in Lipie. Once the investment is completed, the share of the population of the municipality of Lipie using a waste water treatment system in accordance with Directive 91/271/EEC will increase and the pollution of the environment (especially water) will be reduced. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.05.01.02-24-06D6/17
    0 references