Commissioning of hybrid wind turbines production (Q123381)

From EU Knowledge Graph
Revision as of 16:41, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q123381 in Poland
Language Label Description Also known as
English
Commissioning of hybrid wind turbines production
Project Q123381 in Poland

    Statements

    0 references
    1,480,275.0 zloty
    0 references
    355,266.0 Euro
    13 January 2020
    0 references
    3,289,500.0 zloty
    0 references
    789,480.0 Euro
    13 January 2020
    0 references
    45.0 percent
    0 references
    1 March 2017
    0 references
    31 March 2019
    0 references
    GATNER DARIUSZ FIRMA HANDLOWO-USŁUGOWA "DAREX"
    0 references
    0 references

    50°13'26.8"N, 18°43'37.6"E
    0 references
    Projekt zakłada wdrożenie do produkcji typoszeregu hybrydowych turbin wiatrowych w układzie szeregowym o osi poziomej (Polish)
    0 references
    The project assumes implementation for the production of hybrid wind turbines in serial system with horizontal axis (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.03.02.00-24-0278/17
    0 references