1791 kW photovoltaic power plant in Chwałowice.
Project Q118597 in Poland

    Statements

    0 references
    4,713,224.76 zloty
    0 references
    1,131,173.94 Euro
    13 January 2020
    0 references
    5,891,530.95 zloty
    0 references
    1,413,967.43 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    1 February 2018
    0 references
    31 December 2020
    0 references
    DEWELOPER APKLAN PIOTR KAWALEC
    0 references
    0 references
    Ogólnym celem projektu jest ograniczenie emisji gazów cieplarnianych przez sektor energetyczny zaś celem szczegółowym wytwarzanie energii elektrycznej pochodzącej z odnawialnych źródeł. Realizacja tych celów wpłynie na poprawę stanu i ochronę środowiska naturalnego. Cele projektu osiągnięte zostaną w okresie 12 miesięcy od dnia zakończenia realizacji inwestycji polegającej na rozbudowie elektrowni fotowoltaicznej.Przedmiotem inwestycji jest budowa elektrowni fotowoltaicznej o mocy 1791 kW. Projektowana instalacja będzie zlokalizowana w miejscowości Chwałowice, gm. Radomyśl nad Sanem na działkach nr 2307, 2308, 2316. Elektrownia składać się będzie z paneli fotowoltaicznych. Panele będą współpracowały z inwerterami o łącznej mocy 1791 kW (AC). Przyłączenie urządzeń planuje się do istniejącej linii kablowej SN zakończonej na słupie stacji trafo STp-1 będącej elementem składowym istniejącej obecnie instalacji solarnej o mocy 99 kW. Część inwerterów planuje się przyłączyć do istniejącej rozdzielnicy RS. Energia produkowana przez elektrownię będzie dostarczana do sieci energetycznej SN 15kV, poprzez istniejące przyłącze napowietrzno - kablowe SN 15 kV. Pomiar energii realizowany będzie za pomocą istniejącej bramki pomiarowej.Realizacja projektu obejmuje swym zakresem:•wykonanie odcinka linii kablowej SN 15kV w relacji, stacja STp-3 i STp-2 oraz STp-2 i STp-1. STp-1 - istniejąca stacja trafo•przebudowa istniejącego kabla SN zasilającego stację STp-1 po nowej trasie na odcinku ok. 100 m.Montaż:•dwóch prefabrykowanych napowietrznych stacji transformatorowych 15/0,4kV o docelowej mocy 630 kVA•rozdzielnic RS-2 i RS-3 wraz z układami pomiarowo-rozliczeniowych na napięciu 0,4kVWykonanie:•linii kablowych nN kablem ziemnym od rozdzielnic RS-1 – RS-3 do projektowanych węzłów energetycznych W2 – W13•instalacji uziemiającejMontaż:•konstrukcji wsporczych•paneli fotowoltaicznych•inwerterów fotowoltaicznych•instalacji elektrycznej•systemu monitoringu wraz z transmisją danych (Polish)
    0 references
    The overall objective of the project is to reduce greenhouse gas emissions from the energy sector and specifically to generate electricity from renewable sources. Achieving these objectives will improve the state and protect the environment. The project’s objectives will be achieved within 12 months from the date of completion of the investment consisting of the expansion of a photovoltaic power plant.The purpose of the investment is the construction of a photovoltaic power plant with a capacity of 1791 kW. The planned installation will be located in Chwałowice, Radomyśl nad Sanem on plots no. 2307, 2308, 2316. The power plant will consist of photovoltaic panels. The panels will work with inverters with a total power of 1791 kW (AC). The connection of the devices is planned to be connected to the existing SN cable line terminated on the column of the STP-1 trafo station, which is a component of the existing solar installation with a capacity of 99 kW. Some inverters are planned to join the existing RS switchboard. The energy produced by the power plant will be supplied to the power grid SN 15 kV through the existing overhead and cable connection SN 15 kV. The implementation of the project includes:•implementation of the cable line SN 15 kV in relation, STP-3 and STP-2 and STP-2 and STP-1 stations. STP-1 – an existing trafo station•renovation of the existing SN cable supplying the STP-1 station after a new route on a section of approx. 100 m.Installation:•two prefabricated overhead transformer stations 15/0,4 kV with the target power of 630 kVA•s RS-2 and RS-3 switchgears together with measuring and billing systems at 0.4kVMade of:•wire cables nN cable with earth cable from RS-1 switchgears – RS-3 to designed energy nodes W2 – W13•installation of photovoltacles in the photovoltacles from RS-1 – RS-3 switchboards to the design of energy nodes W2 – W13•installation of photovolved data (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.03.01.00-18-0499/17