Deep energy modernisation of public utility buildings in Strzyżowski County (Q118732)

From EU Knowledge Graph
Revision as of 16:16, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q118732 in Poland
Language Label Description Also known as
English
Deep energy modernisation of public utility buildings in Strzyżowski County
Project Q118732 in Poland

    Statements

    0 references
    2,008,408.81 zloty
    0 references
    482,018.11 Euro
    13 January 2020
    0 references
    2,362,833.95 zloty
    0 references
    567,080.15 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 March 2016
    0 references
    31 October 2018
    0 references
    POWIAT STRZYŻOWSKI
    0 references
    Projekt dotyczy modernizacji energetycznej dwóch budynków użyteczności publicznej zlokalizowanych w Strzyżowie przy ul. Parkowej 7 na dz. ewid.nr 818/6, 818/8, 821/2, 822/1, 829/16, 829/6 oraz w Dobrzechowie na dz. ewid. nr 1190/35 i 1190/36. 1. W budynku w Strzyżowie zaplanowano: - wymianę instalacji c.o. oraz kotłów olejowych o mocach 140 kW każdy, na moduł gazowy kogeneracyjny o mocy termicznej 15kW i mocy elektrycznej do 6kW wraz z dwoma kotłami gazowymi kondensacyjnymi z zamkniętą komorą spalania o mocy 63 kW każdy, pompa ciepła powietrze – powietrze dla potrzeb instalacji wentylacji mechanicznej oraz instalacja fotowoltaiczna o mocy 28 kWp umieszczona na dachu wraz z przystosowaniem instalacji elektrycznej budynku do zasilania urządzeń, w celu zapewnienia źródła odnawialnej energii dla zasilania pompy ciepła, system inteligentnego zarządzania ogrzewaniem, - system przygotowania cieplej wody użytkowej (zasobnik cwu ogrzewany z kotłowni gazowej), - ocieplenia ścian, fundamentów, stropodachów; - wymiany stolarki okiennej i drzwiowej. 2. W budynku w Dobrzechowie zaplanowano: - wymianę instalacji c.o. oraz kotła węglowego na kocioł gazowy kondensacyjny z zamkniętą komorą spalania o mocy 63kW, system inteligentnego zarządzania ogrzewaniem wraz z przystosowaniem instalacji elektrycznej; - ocieplenia ścian, fundamentów, stropodachów; - wymiany stolarki okiennej i drzwiowej. Realizacja inwestycji pozwoli na uzyskanie: a) w budynku przy ul. Parkowa 7 w Strzyżowie wskaźnika EP na poziomie 166,61 [kWh/(m2 · rok)] (dane ze Świadectwa energetycznego - po termomodernizacji str. 3) oraz zostanie zmniejszone zapotrzebowanie na zużycie energii o 83,61 % (dane z Audytu energetycznego str. 4). b) w budynku w Dobrzechowie uzyskać wskaźnik EP na poziomie 189,42 [kWh/(m2 · rok)] (dane ze Świadectwa energetycznego - po termomodernizacji str. 3) oraz zostanie zmniejszone zapotrzebowanie na zużycie energii o 90,09 % (dane z Audytu energetycznego str. 4). (Polish)
    0 references
    The project concerns the energy modernisation of two public buildings located in Strzyżów on a street. Parkowa 7 on dz. ewid.No 818/6, 818/8, 821/2, 822/1, 829/16, 829/6 and in Dobrachów on OJ L 1190/35 and 1190/36. 1. In the building in Strzyżów it is planned: — replacement of central heating systems and oil boilers with a capacity of 140 kW each, for a cogeneration gas module with a thermal power of 15 kW and an electric power up to 6 kW, together with two condensation gas boilers with a closed combustion chamber of 63 kW each, each, an air heat pump for the purposes of the heating of mechanical ventilation systems and a photovoltaic installation of 28 kWp installed on the roof together with the installation of the building’s electrical system for the power supply of the appliances, in order to ensure the power supply of the boiler, to ensure the power supply of the boilers, to ensure the heating of the heating system, to ensure the power supply of 140 kW. — replacement of window and door carpentry. 2. In the building in Dobrachów, the following are planned: — replacement of the central heating system and a coal boiler with a condensation gas boiler with a closed combustion chamber of 63 kW, an intelligent heating management system with the adaptation of the electrical installation; — insulation of walls, foundations, stropodache; — replacement of window and door carpentry. The realisation of the investment will allow to obtain: a) in the building on ul. Parkowa 7 in Strzyżów EP index at the level of 166,61 [kWh/(m²· year)] (data from the Energy Certificate – after the thermomodernisation str. 3) and the demand for energy consumption will be reduced by 83.61 % (data from the Energy Audit p. 4. b) in the building in Dobrachów get an EP indicator of 189.42 [kWh/(m²· year)] (data from the Energy Certificate – after thermomodernisation str. 3) and the demand for energy consumption will be reduced by 90.09 % (data from the Energy Audit p. 4. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.03.02.00-18-0106/16
    0 references