“Construction of sanitary sewerage with connections in towns: Batycze, Maćkowice, Kosienice with the extension and reconstruction of the sewage treatment plant in Orzechowce” (Q118920)

From EU Knowledge Graph
Revision as of 16:07, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q118920 in Poland
Language Label Description Also known as
English
“Construction of sanitary sewerage with connections in towns: Batycze, Maćkowice, Kosienice with the extension and reconstruction of the sewage treatment plant in Orzechowce”
Project Q118920 in Poland

    Statements

    0 references
    7,703,972.9 zloty
    0 references
    1,848,953.50 Euro
    13 January 2020
    0 references
    9,063,497.53 zloty
    0 references
    2,175,239.41 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    26 August 2016
    0 references
    30 September 2018
    0 references
    GMINA ŻURAWICA
    0 references
    Celem głównym projektu jest uporządkowanie gospodarki ściekowej gminy, ograniczenie zanieczyszczeń przedostających się do środowiska i zapobieganie degradacji środowiska naturalnego. Realizacja projektu wpłynie na zwiększenie dostępności do sieci kanalizacyjnej, podniesienie standardu życia na terenie aglomeracji Orzechowce oraz podniesienie atrakcyjności inwestycyjnej i rozwój turystyki na terenie gminy. Przedmiotem projektu jest budowa sieci kanalizacji sanitarnej w miej.: Batycze, Maćkowice i Kosienice oraz rozbudowa i przebudowa oczyszczalni ścieków w miej.i Orzechowce na terenie gminy Żurawica. Zakres inwestycji w miejscowościach Batycze, Maćkowice i Kosienice obejmuje budowę sieci kanalizacji sanitarnej typu ciśnieniowo-grawitacyjnego wraz z przyłączami do budynków. Zaprojektowane układy sieci będą umożliwiały odprowadzanie ścieków z posesji zlokalizowanych w w/w miejscowościach, których odbiornikiem będzie istniejąca oczyszczalnia ścieków w Orzechowcach. Na odcinkach, gdzie rzeźba terenu nie pozwala na grawitacyjny przepływ ścieków zlokalizowane będą przepompownie ścieków. Na zmianach kierunku trasy oraz załamaniach kanalizacji grawitacyjnej zaprojektowano studzienki rewizyjne, a w przypadku kanalizacji ciśnieniowej w najwyższych punktach studzienki odpowietrzające a najniższych studzienki odwadniające. Kanalizacja będzie wykonywana z materiałów atestowanych oraz dopuszczonych do stosowania w budownictwie. W ramach projektu zostanie wybudowanych 22,42 km kan. sanitarnej i wykonane 225 przyłączy do budynków. Zakres inwestycji w oczyszczalni ścieków obejmuje modernizację i przebudowę budynku technologicznego z zapleczem socjalnym, likwidację istniejących komór fermentacyjnych i poletek do osuszania osadu oraz budowę zbiornika retencyjnego, reaktora biologicznego, komory pomiarowej, stanowiska zlewnego, wiaty i altany śmietnikowej. Docelowe parametry oczyszczalni: Qdśr = 450,0 m3/d, Qdmax = 630,0 m3/d, RLM = 3 400. (Polish)
    0 references
    The main objective of the project is to organise the sewage management of the municipality, reduce pollution entering the environment and prevent environmental degradation. The implementation of the project will increase accessibility to the sewage network, increase the standard of living in the Orzechowiec agglomeration and increase investment attractiveness and development of tourism in the commune. The subject of the project is the construction of sanitary sewage system in the: Batycze, Maćkowice and Kosienice, as well as extension and reconstruction of sewage treatment plants in Orzechowiec in the municipality of Żurawica. The scope of investments in the towns of Batycze, Maćkowice and Kosienice includes the construction of a sanitary sewage system of the type of pressure-gravity type with connections to the buildings. The designed systems of the network will allow sewage to be drained from properties located in the above-mentioned villages whose receiver will be an existing sewage treatment plant in Orzechowce. On sections where the land sculpture does not allow gravitational flow of sewage, sewage pumping plants will be located. On the changes in the direction of the route and the collapses of the gravity drainage system, inspection wells were designed, and in the case of pressure drainage at the highest points venting wells and the lowest drainage wells were designed. The sewage system will be made of materials certified and approved for use in the construction industry. As part of the project, 22.42 km of sanitary canal will be built and 225 connections to buildings will be made. The scope of investments in waste water treatment plants includes the modernisation and reconstruction of a technological building with social facilities, the liquidation of existing fermentation chambers and sludge dehumidification fields, as well as the construction of a retention tank, biological reactor, measuring chamber, sinking station, shelters and garbage basin. Treatment plant targets: Qdśr = 450,0 m³/d, Qdmax = 630,0 m³/d, RLM = 3 400. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.04.03.01-18-0027/16
    0 references