Mechanical construction of the biological sewage treatment plant in Błoń with the construction of sanitary sewage system in Podole, Commune Przecław (Q118890)

From EU Knowledge Graph
Revision as of 15:38, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q118890 in Poland
Language Label Description Also known as
English
Mechanical construction of the biological sewage treatment plant in Błoń with the construction of sanitary sewage system in Podole, Commune Przecław
Project Q118890 in Poland

    Statements

    0 references
    6,233,533.09 zloty
    0 references
    1,496,047.94 Euro
    13 January 2020
    0 references
    7,333,568.36 zloty
    0 references
    1,760,056.41 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 June 2016
    0 references
    15 February 2018
    0 references
    GMINA PRZECŁAW
    0 references
    Przedmiotem projektu jest budowa mechaniczno-biologicznej oczyszczalni ścieków w miejscowości Błonie oraz budowa kanalizacji sanitarnej w miejscowości Podole. Błonie i Podole to dwie z pośród 10 wsi, które łącznie z miastem Przecław stanowią Gminę Przecław. Położone są one na terenie Aglomeracji Przecław. Niski poziom skanalizowania gminy–(32,3% w gminie gdy w województwie 68,7%) będący przyczyną wielu zagrożeń dla środowiska naturalnego i mieszkańców niesie za sobą konieczność dalszego procesu kanalizacji gminy. Brak jednak takiej możliwości ze względu na stan techniczny istniejącej oczyszczalni ścieków i jej przepustowość. Istniejąca oczyszczalnia obsługująca całą aglomerację Przecław nie dotrzymuje standardów określonych w Dyrektywie Rady z dnia 21 maja 1991 r. dotyczącej oczyszczania ścieków komunalnych. Problemy te zostaną rozwiązane przez realizację niniejszego projektu. Jego głównym celem jest zapewnienie oczyszczania ścieków komunalnych w aglomeracji Przecław zgodnie z wymogami Dyrektywy 91/271/EWG oraz zwiększenie dostępności do systemu kanalizacji zbiorczej w aglomeracji Przecław przede wszystkim w miejscowości Podole. W wyniku realizacji projektu powstanie mechaniczno-biologiczna oczyszczalnia ścieków w Błoniu o przepustowości docelowej 1 010 m3/d. W ramach zadania powstaną 2 reaktory biologiczne, budynek techniczny, zbiornik magazynowy osadu nadmiernego, pompownia ścieków, zbiorniki uśredniające ścieków i osadów dowożonych, studnia pomiarowa, taca najazdowa, stacje: zlewcza i kraty hakowej, budynek na agregat prądotwórczy, śmietnik, fundament pod silos na wapno, studnia wody technologicznej. Nastąpi dostawa technologii i wyposażenia technologicznego wraz z montażem i uruchomieniem oczyszczania ścieków. Oczyszczalnia wyposażona zostanie w niezbędne instalacje. Projekt obejmuje również budowę 8,27 km sieci kanalizacji sanitarnej w Podolu (rejon przepompowni od P4 do P8). Powstanie 5,24 km kolektorów, 1,51 km przyłączy, 1,52 km rurociągów tłocznych. (Polish)
    0 references
    The subject of the project is the construction of a mechanical and biological sewage treatment plant in Błonie and the construction of sanitary sewage system in Podole. Membranes and Podole are two of the 10 villages, which together with the city of Przecław constitute the Commune of Przecław. They are located in the Agglomeration Przecław. The low level of drainage of the commune-(32.3 % in the commune when 68.7 % in the voivodship) is a cause of many threats to the environment and to the inhabitants, it is necessary to continue the sewage process of the commune. However, this is not possible due to the technical condition of the existing sewage treatment plant and its capacity. The existing treatment plant serving the entire agglomeration of Transmission does not comply with the standards set out in the Council Directive of 21 May 1991 on urban waste water treatment. These problems will be addressed by the implementation of this project. Its main objective is to ensure the treatment of municipal waste water in the agglomeration of Transcław in accordance with the requirements of Directive 91/271/EEC and to increase accessibility to the system of collective sewage in the transcław agglomeration primarily in Podole. As a result of the project, a mechanical and biological sewage treatment plant in Błoń with a target capacity of 1010 m³/d will be created. As part of the project, 2 biological reactors, technical building, storage tank of excessive sludge, sewage pumping plant, tanks averaging sewage and transport sludge, measuring well, raid tray, stations: sink and hook lattice, building for generator generator, dumpster, foundation for silo for lime, well of technological water. Technology and technological equipment will be delivered together with the installation and commissioning of waste water treatment. The treatment plant will be equipped with the necessary installations. The project also includes the construction of 8.27 km of sanitary sewage system in Podól (the pumping station district from P4 to P8). There will be 5.24 km of collectors, 1.51 km of connections, 1.52 km of pipelines. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.04.03.01-18-0006/16
    0 references