Reconstruction of the educational building for vocational education in the General School Complex. Jozef Kustronia in Lubaczów. (Q119252)

From EU Knowledge Graph
Revision as of 15:29, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q119252 in Poland
Language Label Description Also known as
English
Reconstruction of the educational building for vocational education in the General School Complex. Jozef Kustronia in Lubaczów.
Project Q119252 in Poland

    Statements

    0 references
    2,988,384.01 zloty
    0 references
    717,212.16 Euro
    13 January 2020
    0 references
    3,515,745.9 zloty
    0 references
    843,779.02 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    10 October 2016
    0 references
    28 February 2018
    0 references
    POWIAT LUBACZOWSKI
    0 references
    Celem ogólnym projektu jest poprawa warunków kształcenia zawodowego i ustawicznego w powiecie lubaczowskim. Cel główny będzie realizowany poprzez następujące cele szczegółowe: -poprawę dostępności budynku edukacyjno socjalnego Zespołu Szkół w Lubaczowie dla osób niepełnosprawnych, - przebudowę budynku edukacyjno socjalnego z dostosowaniem go do potrzeb kształcenia ustawicznego, - zmniejszenie strat energii poprzez termomodernizację, wymianę instalacji elektrycznej, CO i wodnej. Zadanie obejmuje całkowitą przebudowę budynku dydaktycznego, w którym oprócz pracowni dydaktycznych znajdują się pokoje socjalne dla uczniów oraz stołówka i kuchnia. Łącznie pow. użytkowa w budynku po przebudowie = 2.284,16 m2, w tym pow. internatu – 543,20 m2, pow. stołówki 294,55 m2 i pow. dydaktyczne – 1446,41 m2. Kubatura budynku po przebudowie = 13.986,96 m3. Jak wynika z powyższego zestawienia powierzchni dominujący zakres robót dotyczy pomieszczeń dydaktycznych. W budynku zaprojektowano pracownie do nauki przedmiotów zawodowych i języków obcych zawodowych, kuchnię wraz z zapleczem i stołówkę, pokoje sypialne dla uczniów z pomieszczeniami sanitarnymi oraz pomieszczenia sanitarne ogólnodostępne i pomocnicze. Parter budynku dostępny będzie dla osób niepełnosprawnych z poziomu chodnika, natomiast piętro budynku poprzez dźwig osobowy. W obrysie klatki schodowej zostanie wykonany szyb panoramiczny dla dźwigu osobowego. Dźwig projektuje się jako 3-przystankowy: parter, I piętro i poddasze nieużytkowe. W ramach gruntownej przebudowy zostaną wykonane nowe stropy, posadzki, zostanie zmieniony układ pomieszczeń, Ponadto wymienione zostaną wszystkie instalacje C.O. elektryczna, wod. kan, zostanie zamontowana nowa stolarka drzwiowa i okienna zewnętrzna i wewnętrzna. Ściany zewnętrzne zostaną docieplone styropianem gr.15cm, fundamenty styropianem gr. 5 cm, posadzki na gruncie styropianem gr. 10 cm, górny strop styr. 30 cm.W ramach prac zostanie również wykonany nowy dach łącznie z więźbą dachową. (Polish)
    0 references
    The general objective of the project is to improve the conditions of vocational and continuing training in Lubaczów County. The main objective will be pursued through the following specific objectives: —improvement of accessibility of the educational building of the School Complex in Lubaczów for people with disabilities, – reconstruction of the social educational building with adaptation to the needs of lifelong learning, – reduction of energy losses through thermal modernisation, replacement of electrical, CO and water installations. The task includes a complete reconstruction of the teaching building, in which, in addition to the teaching workshop, there are social rooms for students, as well as a cafeteria and kitchen. Total area used in the building after reconstruction = 2284.16 m², including boarding area – 543.20 m², canteen area 294.55 m² and didactic area – 1446.41 m². The size of the building after reconstruction = 13986.96 m³. According to the above, the dominating scope of the works relates to teaching rooms. The building has designed studios for learning professional subjects and foreign languages, kitchen with facilities and canteen, sleeping rooms for pupils with sanitary facilities and sanitary facilities, public and auxiliary sanitary facilities. The ground floor of the building will be accessible to people with disabilities from the sidewalk, while the floor of the building will be accessible through a crane. A panoramic shaft for a passenger crane will be made in the stairwell. The crane is designed as a 3-stop: ground floor, first floor and unused loft. As part of a thorough reconstruction, new ceilings, floors, the layout of the rooms will be altered, In addition, all electrical installations, canal water, will be replaced, a new door carpentry and external and internal windows will be installed. The outer walls will be warmed with gr.15cm styrofoam, foundations with gr. 5 cm styrofoam, tiles on the ground with styrofoam gr. 10 cm, upper ceiling Styr. 30 cm.As part of the work, a new roof will also be made, including the roof link. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.06.04.02-18-0004/16
    0 references