Reconstruction of the commune road – section ul. John Paul II in Zatorze. (Q113019)

From EU Knowledge Graph
Revision as of 15:00, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q113019 in Poland
Language Label Description Also known as
English
Reconstruction of the commune road – section ul. John Paul II in Zatorze.
Project Q113019 in Poland

    Statements

    0 references
    1,094,451.21 zloty
    0 references
    262,668.29 Euro
    13 January 2020
    0 references
    1,459,268.29 zloty
    0 references
    350,224.39 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    2 October 2017
    0 references
    30 September 2019
    0 references
    GMINA ZATOR
    0 references
    0 references
    Przedmiotem projektu jest przebudowa odcinka drogi gminnej nr 510404K o dł. 503 mb i zmiennej szerokości jezdni od. 5,3 mb do 6,0 mb w ramach istniejącego pasa drogowego o parametrach zgodnych z isyniejącymi przepisami wraz z rozdzieleniem i przebudową kanalizacji ogólnospławnej i deszczowej, przebudową chodnika jednostronnego i oświetlenia ulicznego. Przedmiotowa inwestycja polega na: przebudowie nawierzchni jezdni bitumicznej w ciągu ul. Jana Pawła II oraz na wlotach skrzyżowań; przebudowie skrzyżowania z ulicą Słowackiego i ulicą Królewską skrzyżowanie wyniesione o nawierzchni z kostki brukowej przebudowie chodników; przebudowie prawostronnego pobocza gruntowego; przebudowie systemu odwodnienia budowie kanalizacji deszczowej; przebudowie istniejących zjazdów; wykonaniu urządzeń oznakowania pionowego i poziomego oraz urządzeń BRD; regulacji wysokościowej i zabezpieczenia urządzeń podziemnych.Wartości parametrów niezbędnych do wykonania przedmiotowej dokumentacji projektowejprzyjmowano zgodnie z publikacjami przytoczonymi w punkcie 1 niniejszego opracowania: Kategoria drogi: gminna; Klasa drogi: Z zbiorcza; Prędkość projektowa: 40kmh; Kategoria ruchu: KR 3; Przekrój: daszkowy 2, 1x2; Szerokość pasa ruchu: 3.00m; Szerokość pobocza: 1.00m; Szerokość chodnika: 1.50 2.00m; Pochylenie poprzeczne jezdni: daszkowe 2; Pochylenie poprzeczne pobocza: 7;Zgodnie z uzgodnieniem z Zarządcą Drogi przyjęto kategorię ruchu KR3 na projektowanych odcinkach. (Polish)
    0 references
    The subject of the project is the reconstruction of the section of communal road No. 510404K by dł. 503 mb and variable road width from. 5.3 m to 6.0 mb within the existing road lane with parameters complying with the existing regulations, including separation and reconstruction of general and rainwater sewerage, reconstruction of one-sided pavement and street lighting. The investment in question consists of: reconstruction of the bituminous road pavement throughout the street. John Paul II and at intersection inlets; redevelopment of the junction with Słowackiego Street and Królewska Street a crossroads erected with paving stone reconstruction; reconstruction of the right-hand side of the groundside; reconstruction of the drainage system for the construction of rainwater drainage; reconstruction of existing exits; execution of vertical and horizontal marking devices and BRD devices; the values of the parameters necessary for the execution of the project documentation were adopted in accordance with the publications cited in point 1 of this study: Category of road: commune; Road class: Of aggregate; Design speed: 40kmh; Category of traffic: COR 3; A cross-section: top 2, 1x2; Lane width: 3.00 m; Width of the side: 1.00 m; Width of the pavement: 1.50 2.00 m; Lateral inclination of the road: visceral 2; Lateral inclination of the side: 7;According to the agreement with the Road Manager, the KR3 traffic category was adopted on the design sections. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.07.01.03-12-1068/17
    0 references