Reconstruction of the commune road – section ul. John Paul II in Zatorze. (Q113019)

From EU Knowledge Graph
Revision as of 15:00, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q113019 in Poland
Language Label Description Also known as
English
Reconstruction of the commune road – section ul. John Paul II in Zatorze.
Project Q113019 in Poland

    Statements

    0 references
    1,094,451.21 zloty
    0 references
    262,668.29 Euro
    13 January 2020
    0 references
    1,459,268.29 zloty
    0 references
    350,224.39 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    2 October 2017
    0 references
    30 September 2019
    0 references
    GMINA ZATOR
    0 references
    0 references
    Przedmiotem projektu jest przebudowa odcinka drogi gminnej nr 510404K o dł. 503 mb i zmiennej szerokości jezdni od. 5,3 mb do 6,0 mb w ramach istniejącego pasa drogowego o parametrach zgodnych z isyniejącymi przepisami wraz z rozdzieleniem i przebudową kanalizacji ogólnospławnej i deszczowej, przebudową chodnika jednostronnego i oświetlenia ulicznego. Przedmiotowa inwestycja polega na: przebudowie nawierzchni jezdni bitumicznej w ciągu ul. Jana Pawła II oraz na wlotach skrzyżowań; przebudowie skrzyżowania z ulicą Słowackiego i ulicą Królewską skrzyżowanie wyniesione o nawierzchni z kostki brukowej przebudowie chodników; przebudowie prawostronnego pobocza gruntowego; przebudowie systemu odwodnienia budowie kanalizacji deszczowej; przebudowie istniejących zjazdów; wykonaniu urządzeń oznakowania pionowego i poziomego oraz urządzeń BRD; regulacji wysokościowej i zabezpieczenia urządzeń podziemnych.Wartości parametrów niezbędnych do wykonania przedmiotowej dokumentacji projektowejprzyjmowano zgodnie z publikacjami przytoczonymi w punkcie 1 niniejszego opracowania: Kategoria drogi: gminna; Klasa drogi: Z zbiorcza; Prędkość projektowa: 40kmh; Kategoria ruchu: KR 3; Przekrój: daszkowy 2, 1x2; Szerokość pasa ruchu: 3.00m; Szerokość pobocza: 1.00m; Szerokość chodnika: 1.50 2.00m; Pochylenie poprzeczne jezdni: daszkowe 2; Pochylenie poprzeczne pobocza: 7;Zgodnie z uzgodnieniem z Zarządcą Drogi przyjęto kategorię ruchu KR3 na projektowanych odcinkach. (Polish)
    0 references
    The subject of the project is the reconstruction of the section of communal road No. 510404K by dł. 503 mb and variable road width from. 5.3 m to 6.0 mb within the existing road lane with parameters complying with the existing regulations, including separation and reconstruction of general and rainwater sewerage, reconstruction of one-sided pavement and street lighting. The investment in question consists of: reconstruction of the bituminous road pavement throughout the street. John Paul II and at intersection inlets; redevelopment of the junction with Słowackiego Street and Królewska Street a crossroads erected with paving stone reconstruction; reconstruction of the right-hand side of the groundside; reconstruction of the drainage system for the construction of rainwater drainage; reconstruction of existing exits; execution of vertical and horizontal marking devices and BRD devices; the values of the parameters necessary for the execution of the project documentation were adopted in accordance with the publications cited in point 1 of this study: Category of road: commune; Road class: Of aggregate; Design speed: 40kmh; Category of traffic: COR 3; A cross-section: top 2, 1x2; Lane width: 3.00 m; Width of the side: 1.00 m; Width of the pavement: 1.50 2.00 m; Lateral inclination of the road: visceral 2; Lateral inclination of the side: 7;According to the agreement with the Road Manager, the KR3 traffic category was adopted on the design sections. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.07.01.03-12-1068/17
    0 references