Project Q111677 in Poland
Language Label Description Also known as
English
Establishment and expansion of Economic Activity Zones (SAG) together with appropriate infrastructure in Wieliczka commune
Project Q111677 in Poland

    Statements

    0 references
    21,972,120.67 zloty
    0 references
    5,273,308.96 Euro
    13 January 2020
    0 references
    25,953,367.21 zloty
    0 references
    6,228,808.13 Euro
    13 January 2020
    0 references
    84.66 percent
    0 references
    1 August 2017
    0 references
    31 December 2021
    0 references
    GMINA WIELICZKA
    0 references
    Inwestycja realizowana w trybie zaprojektuj i wybuduj polega na: 1.zagospodarowaniu 16,826 ha terenu działki nr 836 1, jedn. ewid. Wieliczka, obręb: Węgrzce Wielkie 0028 w części określonej w mpzp jako obszary 11UP1, 12UP wraz z podziałem na poszczególne strefy funkcjonalne i komunikacyjne zgodnie mpzp poprzez m. in.: oczyszczenie i pogłębienie istniejących rowów melioracyjnych ok. 684 m i cieków wodnych ok. 188m przebudowy rowów melioracyjnych ok. 975 m, usunięciu rowów melioracyjnych ok. 324 m. budowę sieci kanalizacji deszczowej ok. 2153 m. wraz ze studniami rozprężnymi i pompami budowę sieci kanalizacji sanitarnej ok. 2010 m. budowę sieci wodociągowej ok. 2010 m. wraz z hydrantami budowę sieci elektrycznej ok. 1966 m. wraz z ZZP budowę linii oświetlenia ok. 4 000 m. wraz z osprzętem budowę sieci monitoringu ok. 3 000 m. wraz z osprzętem i wyposażeniem. budowę drogi wewnętrznej kategorii 4KDZ wraz ze ścieżką rowerową 785 m. budowę układu dróg wewnętrznych ok. 1196 m.2. prowadzeniu prac inwestycyjnych poza terenem działki 8361 w celu doprowadzenia do działki 8361 niezbędnej infrastruktury, w tym w szczególności: oczyszczenie i pogłębienie istniejących rowów melioracyjnych oczyszczenia i pogłębienia istniejących cieków wodnych ok. 388 m przebudowy rowu melioracyjnego ok. 63 m budowa sieci kanalizacji deszczowej ok. 807 m., sanitarnej ok. 1167 m. i wodociągowej ok. 4 933 m. budowa zasilania pompowni ok. 935 m. budowa sieci energetycznej od stacji transformatorowej do granic działki ok. 75 m.Powyższe parametry zostaną uszczegółowione na etapie projektów wykonawczych. Integralną częścią projektu są działania przygotowawcze m.in. opracowanie dokument. projektowo kosztorysowej. Powierzchnia SAG wynosi 16,826ha. Projekt gwarantuje wyposażenie SAG w odpowiedniej jakości, kompleksową infrastrukturę o odpowiednich parametrach technicznych. Dalsze:Q (Polish)
    0 references
    The investment implemented in the design and build mode consists of: 1.occupied 16.826 ha of plot no. 836 1, one. Wieliczka, the perimeter: Węgrzce Wielkie 0028 in the part defined in the MPZP as areas 11UP1, 12UP with division into individual functional and communication zones according to the MPZP through inter alia: cleansing and deepening existing drainage ditches approx. 684 m and watercourses approx. 188 m reconstruction of drainage ditches approx. 975 m, removal of drainage ditches approx. 324 m. construction of rainwater drainage network approx. 2153 m. with expansion wells and pumps construction of sanitary sewage system approx. 2010 m. construction of water supply network approx. 2010 m. with hydrants construction of the electrical grid approx. 1966 m. with ZZP construction of lighting line approx. 4000 m. with accessories construction of a monitoring network approx. 3000 m. with fittings and equipment. construction of an internal road category 4KDZ together with a bicycle path 785 m. construction of an internal road system approx. 1196 m.2. carrying out investment works outside plot 8361 in order to bring the necessary infrastructure to plot 8361, including in particular: cleansing and deepening existing drainage ditches cleaning and deepening existing watercourses approx. 388 m reconstruction of the drainage ditch approx. 63 m construction of rainwater drainage network approx. 807 m., sanitary approx. 1167 m. and water supply approx. 4933 m. construction of the pumping room power supply approx. 935 m. construction of the power grid from the transformer station to the boundaries of the plot approx. 75 m.The above parameters will be further refined at the stage of implementing projects. An integral part of the project are preparatory actions, e.g. drafting and costing. The area of SAG is 16.826 ha. The project guarantees that SAG is equipped with the right quality, comprehensive infrastructure with appropriate technical parameters. Further:Q (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.03.01.01-12-0432/17