It’s time to enroll the baby in kindergarten! (Q113964)

From EU Knowledge Graph
Revision as of 14:38, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q113964 in Poland
Language Label Description Also known as
English
It’s time to enroll the baby in kindergarten!
Project Q113964 in Poland

    Statements

    0 references
    1,656,746.22 zloty
    0 references
    397,619.09 Euro
    13 January 2020
    0 references
    1,949,113.2 zloty
    0 references
    467,787.17 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 June 2017
    0 references
    31 August 2019
    0 references
    GMINA WIELICZKA
    0 references
    0 references
    4 nowe oddziały przedszkolne (OP) dla dzieci w wieku 3-6lat (43 chłopców, 40 dziewczynek-z danych GUS za lata 2014-2016) wynika, iż chłop. stanowią śr. 51% urodzeń, i taki % przyjęto w projekcie): 2 oddziały przy funkcjonującym Przedszkolu Samorządowym nr 5 w Wieliczce (PS5) oraz 2 nowe ośrodki wychowania przedszkolnego (2x 1 oddział) w Brzegach oraz przy Szkole Podstawowej nr 1 tworzonej w miejsce wygaszanego Gimnazjum (OP przy SP1). Nowo utworzone OP będą dostos. do potrzeb dzieci/rodziców z niepełnosprawn. Gmina przygotowała i przeprowadziła diagnozę potrzeb w zakresie wych.przedsz. na terenie GW (dalej:Diagnozę), która została przyjęta i zatwierdzona Zarządzeniem Burmistrza Miasta i Gminy Wieliczka nr 41/2017 z dnia 15.02.2017r. Diagnozę przepr. w 26 OWP działających na teren. GW, zbadano 200 rodziców dzieci uczęszcz do przedsz oraz chętnych do umieszcz dziecka w OWP; przeprow wywiady z nauczycielami(150);zbadano zapotrzeb, na nowe miejsca przedsz w GW, raporty ORE dot. eduk. Przedszk. Z Diagnozy wynika,iż w roku 2016 było 1366 miejsc przedszk. w GW, ośrodki zgłosiły brak 373 miejsc. Ostat w rekrutacji 2016 do publicz. OWP nie przyjęto 294 dzieci. W projekcie przewidz. działania: 1. utworzenie 83 miejsc przedszk. w PS5, OWP w Brzegach, OWP przy SP1 na terenie GW, w tym dostosowanie i adaptacja pomieszczeń, doposażenie OWP i placu zabaw oraz sfinansowanie kosztów utrzymania nowych 83 miejsc edukacji przedszkolnej przez 12 m-cy 2. Rozszerzenie oferty OWP o zajęcia zwiększające szanse edukacyjne 215 dzieci,w tym 2 dzieci z niepełnospr realiz poza bezpłatnym czasem funkcjonowania OWP, w tym zaj stymulujące rozwój psychoruchowy:gimnastyka korekcyjna, zaj specjalistyczne: logopedyczne, psycholog, zaj wyrównujące szanse edukacyjne dzieci w zakresie stwierdz deficytów: jęz. ang., warsztaty matemat-przyrod (Polish)
    0 references
    4 new kindergarten wards (OP) for children aged 3-6 years (43 boys, 40 girls from the Central Statistical Office for 2014-2016) show that the peasant is wed. 51 % of births, and this is accepted in the project: 2 branches at the functioning Local Government Kindergarten No. 5 in Wieliczka (PS5) and 2 new kindergarten centers (2x 1 branch) in Brzegi and at Primary School No. 1 created in place of the extinguished secondary school (OP at SP1). The newly created OP will be adjusted to the needs of children/parents with disabilities. The commune prepared and carried out a diagnosis of needs in the area of the former in the area of GW (hereinafter:Diagnosis), which was adopted and approved by the Order of the Mayor of Wieliczka No. 41/2017 of 15.02.2017. Diagnosed in 26 GWP operating in the area. GW, 200 parents of children have been investigated in fronts and those willing to place the child in the PLO; apologise for interviews with teachers(150);required needs, new front seats in GW, ORE reports on education. It’s the forehead. According to Diagnosis, in 2016 there were 1366 pre-season sites in GW, the centers reported a lack of 373 seats. The last one in recruiting 2016 to the public. 294 children were not admitted. The project predicts actions: 1. creation of 83 pre-school places in PS5, PLP in Brzegi, PLP at SP1 in GW, including adaptation and adaptation of premises, retrofitting of PLO and playground and financing of maintenance costs of new 83 preschool education sites by 12 m². Extension of the offer of PLOs to classes that increase educational opportunities of 215 children, including 2 children with a lower level of implementation outside of the free time of functioning of PLP, including stimulating psychomotor development: corrective gymnastics, specialised: speech therapy, psychologist, equalising educational opportunities for children in terms of deficits: mathematic-Nature Workshops (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.10.01.01-12-0066/17
    0 references