Revitalisation in Bochnia Municipality (Q114429)

From EU Knowledge Graph
Revision as of 14:36, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q114429 in Poland
Language Label Description Also known as
English
Revitalisation in Bochnia Municipality
Project Q114429 in Poland

    Statements

    0 references
    1,826,656.95 zloty
    0 references
    438,397.67 Euro
    13 January 2020
    0 references
    2,810,241.55 zloty
    0 references
    674,457.97 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    3 April 2017
    0 references
    15 November 2019
    0 references
    GMINA BOCHNIA
    0 references
    Q2524457 (Deleted Item)
    0 references
    Zakres projektu pn. Rewitalizacja w Gminie Bochnia obejmuje cztery działania rewitalizacyjne:1. Przebudowę i rozbudowę Zespołu Szkół Gminnych im. Henryka Sienkiewicza w Bogucicach o przedszkole przedsięwzięcie nr 2 w GPR2. Razem możemy więcej modernizację i adaptację budynku dawnej szkoły w Cikowicach wraz z terenem wokół budynku na miejsce aktywnego spędzania czasu przedsięwzięcie nr 5 w GPR3. Aktywizacja społeczności lokalnej poprzez kompleksową przebudowę przestrzeni publicznej w Ostrowie Szlacheckim przedsięwzięcie nr 18 w GPR4. Z myślą o dzieciach modernizacja budynku przedszkola w Moszczenicy wraz z zagospodarowaniem otoczenia przedsięwzięcie nr 9 w GPR.Elementem wspólnym nowo powstałej infrastruktury obszaru rewitalizacji będzie utworzenie zaplecza technicznego do rozwiązywania problemów społecznych służących aktywizacji społecznej, środowiskowej, międzyludzkiej czyli wzmocnienia więzi społecznych. Prawidłowo rozwinięta infrastruktura publiczna, poprzez organizację różnego rodzaju funkcjonalności, bazy instytucjonalnej dla mieszkańców, wydarzeń oraz imprez służących integracji lokalnej społeczności, umożliwi skuteczną walkę z marginalizacją oraz wykluczeniem społecznym mieszkańców. Ilość oraz stan infrastruktury ogólnodostępnej do korzystania dla mieszkańców na obszarze zdegradowanym w Gminie jest kiepski, wskazane zatem jest podjęcie działań zmieniających ten stan.Powierzchnie poddawane rewitalizacji: a Bogucice: 591,30 m2, tj. 0,059 hab Cikowice 665,82 m2, tj. 0,067 ha:c Moszczenica 235,86 m2, tj. 0,024 ha: d Ostrów Szlachecki: 535,70 m2, tj. 0,053 ha:Łączna powierzchnia obszarów objętych rewitalizacją wynosi: 0,059 ha 0,067 ha 0,024 ha 0,053 ha 0,203 ha (Polish)
    0 references
    Scope of the project Mon. Revitalisation in the Bochnia Municipality includes four revitalisation activities:1. Reconstruction and expansion of Henryk Sienkiewicz School Complex in Bogucice about kindergarten project no. 2 in GPR2. Together we can more modernise and adapt the building of the former school in Cikowice together with the area around the building to the site of active spending time project no. 5 in GPR3. Activation of the local community through a comprehensive reconstruction of public space in Ostrów Szlachecki project no. 18 in GPR4. With children in mind, the modernisation of the kindergarten building in Moszczenica with the development of the environment, project no.9 in the GPR.The common element of the newly created infrastructure of the revitalisation area will be the creation of a technical facility to solve social problems for social, environmental and human activation, i.e. strengthening social ties. A well-developed public infrastructure, through the organisation of various functionalities, an institutional base for residents, events and events to integrate the local community, will enable an effective fight against marginalisation and social exclusion of residents. The number and condition of the public infrastructure available to residents in the degraded area in the commune is poor, so it is advisable to take action to change this condition. and Bogucice: 591,30 m², i.e. 0,059 hab Cikowice 665,82 m², i.e. 0.067 ha:c Moszczenica 235,86 m², i.e. 0,024 ha: d Ostrów Szlachecki: 535,70 m², i.e. 0,053 ha:The total area of the revitalised areas shall be: 0,059 ha 0,067 ha 0,024 ha 0,053 ha 0,203 ha (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.11.02.00-12-0696/17
    0 references