Reconstruction and thermal modernisation of the building of the old part of the school at ul. School 22 in Mońki (Q117026)

From EU Knowledge Graph
Revision as of 14:34, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q117026 in Poland
Language Label Description Also known as
English
Reconstruction and thermal modernisation of the building of the old part of the school at ul. School 22 in Mońki
Project Q117026 in Poland

    Statements

    0 references
    1,083,336.37 zloty
    0 references
    260,000.73 Euro
    13 January 2020
    0 references
    1,274,513.39 zloty
    0 references
    305,883.21 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    22 July 2019
    0 references
    31 December 2020
    0 references
    POWIAT MONIECKI
    0 references
    0 references

    53°24'23.8"N, 22°47'54.2"E
    0 references
    Przedmiotem projektu jest termomodernizacja budynku starej szkoły w Mońkach przy ul. Szkolnej 22. Celem projektu jest poprawa efektywności energetycznej w budynku starej szkoły w Mońkach.Zakres projektu obejmuje termomodernizację budynku części starej szkoły w Mońkach poprzez docieplenie ścian zewnętrznych, wymiana okien i drzwi, docieplenie stropu nad parterem, docieplenie podłogi na gruncie, modernizacja c.o oraz oświetlenia. Dzięki realizacji projektu będzie możliwe zmniejszenie emisji gazów cieplarnianych i innych zanieczyszczeń do atmosfery, redukcja kosztów ogrzewania pozwoli na obniżenie kosztów funkcjonowania instytucji publicznych oraz zwiększenia oszczędności energii w budynku użyteczności publicznej. Grupą docelową w szczególności będą uczniowie i pracownicy szkoły w Mońkach i użytkownicy obiektu, najczęściej korzystający z budynku użyteczności publicznej. Do grupy pośrednich beneficjentów należy także zaliczyć całą społeczność lokalną, która będzie mogła korzystać z obiektu. Realizacja projektu pozwoli na osiągnięcie następujących wskaźników: a)na poziomie produktu: -Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych o 157 780,778 kWh/rok -Szacowany roczny spadek emisji gazów cieplarnianych o 38,839 ton równoważnika CO2,, -Liczba zmodernizowanych energetycznie budynków 1 szt., -Powierzchnia użytkowa budynków poddanych termomodernizacji 316,70 m2, b)na poziomie rezultatu: -Ilość zaoszczędzonej energii elektrycznej 8,176 MWh/rok, -Ilość zaoszczędzonej energii cieplnej 436,10 GJ/rok. Termin realizacji projektu przewidziano od 01.07.2019 r. do 31.12.2020 r. (Polish)
    0 references
    The subject of the project is the thermal modernisation of the old school building in Mońki on ul. The school’s 22. The aim of the project is to improve energy efficiency in the old school building in Mońki.The scope of the project includes the thermal modernisation of the building of part of the old school in Mońki by warming the outer walls, replacing windows and doors, warming the ceiling above the ground floor, warming the floor on the ground, modernisation of the central heating and lighting. Thanks to the project, it will be possible to reduce emissions of greenhouse gases and other pollutants into the atmosphere, reduce heating costs, reduce the operating costs of public institutions and increase energy savings in public buildings. The target group will in particular be pupils and staff of the school in Mońki and users of the facility, most often using the public utility building. The group of indirect beneficiaries should also include the entire local community, which will be able to use the facility. The implementation of the project will allow the following indicators to be achieved: at product level: —Reduction of annual primary energy consumption in public buildings by 157780.778 kWh/year -Assessed annual reduction in greenhouse gas emissions by 38.839 tonnes CO2 equivalent, -Number of energy upgraded buildings 1 units, -Used surfaces of buildings undergoing thermal modernisation 316.70 m², b)at the result level: —The amount of electricity saved 8,176 MWh/year, -The amount of thermal energy saved 436.10 GJ/year. The project is scheduled to be implemented from 01.07.2019 to 31.12.2020. (English)
    20 October 2020
    0 references

    Identifiers

    RPPD.05.03.01-20-0159/18
    0 references