Improving the low-carbon economy of Hajnówka by building photovoltaic micro-installations and solar collectors
Project Q116897 in Poland

    Statements

    0 references
    620,266.96 zloty
    0 references
    148,864.07 Euro
    13 January 2020
    0 references
    954,256.89 zloty
    0 references
    229,021.65 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    15 February 2017
    0 references
    14 December 2018
    0 references
    GMINA MIEJSKA HAJNÓWKA
    0 references
    0 references

    52°43'54.1"N, 23°34'16.3"E
    0 references
    Projekt posiada dwie grupy celów: kwantyfikowane cele bezpośrednie i cele o wymiarze społecznym (trudne do kwantyfikacji). Celami bezpośrednimi projektu są: wzrost produkcji energii z OZE i redukcja emisji CO2. Do celów społecznych należy podniesienie jakości życia mieszkańców poprzez: wzrost jakości infrastruktury technicznej, ochronę środowiska w wyniku redukcji zanieczyszczeń do atmosfery, redukcję kosztów opłat za energię przez mieszkańców. Projekt obejmuje realizację trzech zadań: - przygotowanie dokumentacji technicznej, - instalacja kolektorów słonecznych i paneli fotowoltaicznych, - nadzór inwestorski. W ramach projektu będzie wykonane: 48 instalacji kolektorów słonecznych, 35 instalacje fotowoltaiczne na budynkach mieszkańców gminy. Projekt jest wnioskowany do dofinansowania w ramach typu projektu pierwszego: Energetyka oparta na odnawialnych źródłach energii (energia odnawialna: słoneczna). Beneficjentem projektu jest Gmina Miejska Hajnówka, beneficjenci ostateczni projektu to mieszkańcy gminy, mieszkańcy obiektów – domów w których zostaną zainstalowane urządzenia oraz beneficjenci pośredni – wszyscy mieszkańcy gminy i regionu. Po realizacji projektu zostaną osiągnięte następujące wskaźniki: -Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE – 35 szt. - Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE – 48 szt. - Dodatkowa zdolność wytwarzania energii cieplnej ze źródeł odnawialnych – 0,21 MW - Dodatkowa zdolność wytwarzania energii elektrycznej ze źródeł odnawialnych – 0,14 MW. - Szacowany roczny spadek emisji gazów cieplarnianych -134,24 Mt/ rok. CO2/rok - Produkcja energii cieplnej z nowo wybudowanych instalacji wykorzystujących OZE – 74,82 MWh/rok - Produkcja energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE – 134,00 MWh/rok (Polish)
    0 references
    The project has two sets of objectives: quantified direct objectives and objectives with a social dimension (hard to quantification). The direct objectives of the project are: increased energy production from RES and reduction of CO2 emissions. Social objectives include improving the quality of life of residents by: increasing the quality of technical infrastructure, protecting the environment as a result of reducing pollution to the atmosphere, reducing the cost of energy charges by residents. The project involves three tasks: — preparation of technical documentation, – installation of solar collectors and photovoltaic panels, – investor supervision. As part of the project, the following will be carried out: 48 solar collectors installations, 35 photovoltaic installations on municipal buildings. The project is requested for funding under the type of the first project: Renewable energies (renewable energy: it’s sunny. The beneficiary of the project is the Municipality of Hajnówka, the final beneficiaries of the project are residents of the municipality, residents of buildings – houses where devices will be installed and indirect beneficiaries – all residents of the municipality and region. After the implementation of the project, the following indicators will be achieved: —Number of built electricity generation units from RES – 35 pcs. — Number of built units of thermal energy production from RES – 48 pcs. — Additional capacity to generate heat from renewable sources – 0,21 MW – Additional electricity generation capacity from renewable sources – 0,14 MW. — Estimated annual decrease in greenhouse gas emissions -134.24 Mt/year. CO2/year – Production of heat from newly built RES installations – 74,82 MWh/year – Manufacture of electricity from newly built RES installations – 134,00 MWh/year (English)
    20 October 2020
    0 references

    Identifiers

    RPPD.05.01.00-20-0419/17