Improvement of the energy efficiency of STALCO INDUSTRIES Sp. z o. o. through thermal modernisation of the production hall (Q112178)

From EU Knowledge Graph
Revision as of 13:38, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q112178 in Poland
Language Label Description Also known as
English
Improvement of the energy efficiency of STALCO INDUSTRIES Sp. z o. o. through thermal modernisation of the production hall
Project Q112178 in Poland

    Statements

    0 references
    1,439,800.0 zloty
    0 references
    345,552.0 Euro
    13 January 2020
    0 references
    2,171,000.0 zloty
    0 references
    521,040.0 Euro
    13 January 2020
    0 references
    66.32 percent
    0 references
    1 April 2019
    0 references
    19 July 2021
    0 references
    "STALCO INDUSTRIES" SP. Z O.O.
    0 references
    0 references
    Projekt realizowany przez średnie przedsiębiorstwo z siedzibą w Krakowie pow. Kraków, woj. małopolskie: Stalco Industries Sp. z o.o.W ramach projektu zostanie przeprowadzona głęboka modernizacja energetyczna budynku hali produkcyjnej w Krakowie należącego do Wnioskodawcy, w celu zwiększenia efektywności energetycznej a w konsekwencji konkurencyjności firmy Stalco Industries Sp. z o.o. Projekt wpisuje się w typ A dla Działania 4.2 i obejmuje: termomodernizację budynku ocieplenie ścian zewnętrznych, dachu, wymiana okien, drzwi i bram wymianę źródeł ciepła montaż bardziej wydajnego i efektywnego energetycznie kotła na lekki olej opałowy modernizację systemu oświetlenia wymianę opraw świetlówkowych na LEDW ramach projektu planuje się indywidualnych licznika ciepła oraz termostatów.Okres realizacji projektu przyjęto w latach 20192021. Zakres projektu jest zgodny z wynikami audytu efektywności energetycznej exante. Rezultaty projektu zostaną potwierdzone w formie audytu expost: uzyskanie oszczędności energii cieplnej na poziomie 946,82 GJrok uzyskanie oszczędności energii elektrycznej na poziomie 17,64 MWhrok uzyskanie efektywności energetycznej na poziomie 83 redukcja emisji CO2 na poziomie 79Wsparcie w formie dotacji otrzyma 1 przedsiębiorstwo: Stalco Industries Sp. z o.o., przeznaczone na modernizację 1 budynku hali produkcyjnej zlokalizowanego w Krakowie. (Polish)
    0 references
    Project implemented by a medium-sized enterprise based in Krakow pow. Kraków, Małopolskie voivodship: Stalco Industries Sp. z o.o.As part of the project, a deep energy modernisation of the production hall in Krakow, belonging to the Applicant, will be carried out in order to increase energy efficiency and consequently the competitiveness of Stalco Industries Sp. z o.o. The project fits into Type A for Measure 4.2 and includes: thermal modernisation of the building insulation of external walls, roof, replacement of windows, doors and gates replacement of heat sources installation of a more efficient and energy-efficient boiler for light heating oil modernisation of lighting system replacement of light bulbs with LEDThe project is planned for individual heat meters and thermostats.The project period was adopted in the 20192021s. The scope of the project is consistent with the results of the exante energy efficiency audit. The results of the project will be confirmed in the form of an expost audit: achieving a thermal energy savings of 946.82 GJrok achieving an electricity savings of 17.64 MWhrok achieving energy efficiency of 83, reducing CO2 emissions of 79The support in the form of grants will receive 1 company: Stalco Industries Sp. z o.o., designed for the modernisation of the 1st production hall building located in Krakow. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.02.00-12-0472/18
    0 references