Creating conditions for the functioning of metropolitan transport through the construction of the P&R car park and the interchange node within the commune of Świątniki Górne_2 (Q112502)

From EU Knowledge Graph
Revision as of 12:47, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q112502 in Poland
Language Label Description Also known as
English
Creating conditions for the functioning of metropolitan transport through the construction of the P&R car park and the interchange node within the commune of Świątniki Górne_2
Project Q112502 in Poland

    Statements

    0 references
    1,819,753.23 zloty
    0 references
    436,740.78 Euro
    13 January 2020
    0 references
    2,378,140.66 zloty
    0 references
    570,753.76 Euro
    13 January 2020
    0 references
    76.52 percent
    0 references
    1 March 2017
    0 references
    28 February 2019
    0 references
    GMINA ŚWIĄTNIKI GÓRNE
    0 references
    Przedmiotowy projekt polega na budowie parkingu typu P&R wraz z węzłem przesiadkowym. Na parkingu przeznaczonym wyłącznie dla osób posiadających bilet komunikacji zbiorowej wybudowanych zostanie 50 miejsc postojowych, w tym dwa dla osób niepełnosprawnych. W związku ze znacznymi różnicami poziomu terenu wierzchnia cześć parkingu została zaprojektowana jako ogólnodostępna przestrzeń publiczna, gdzie znajdzie się 21 miejsc parkingowych. W części podziemnej przewidziano 29 miejsc parkingowych dla samochodów osobowych, a także miejsca postojowe dla rowerów i pozostałych pojazdów jednośladowych.Zaprojektowano również ogólnodostępną toaletę dla osób korzystających z obiektu oraz niezbędne pomieszczenia techniczne związane z parkingiem. Budynek charakteryzują następujące parametry: Kubatura: 3 200 m3 Wysokość 4,2 m Liczba kondygnacji: I kondygnacja nadziemna, (brak podpiwniczenia) Powierzchnia zabudowy: 762 m2 Realizowana infrastruktura stanowi zintegrowany węzeł przesiadkowy, integrujący 2 podsystemy transportu zbiorowego (autobusy aglomeracyjne oraz busy/autobusy przewoźników prywatnych) oraz transport indywidualny samochodowy i rowerowy w ramach P+R. Infrastruktura węzła obejmuje miejsca postojowe dla samochodów, motocykli i rowerów, zadaszony przystanek komunikacyjny wraz z rozkładem jazdy, umożliwiającym zapoznanie się z liniami komunikacyjnymi oraz godzinami i kierunkami odjazdów. Parking zostanie wyposażony w niezbędne instalacje, w tym: wodnokanalizacyjną, wentylacji mechanicznej, elektryczną oraz monitoringu. Dodatkowo dla podniesienia estetyki obiektu zaprojektowano umieszczenie elementów małej architektury, takich jak ławki, donice, słupy oświetleniowe, kosze na śmieci. Projekt przewiduje oznakowanie dojazdu do parkingu poprzez zastosowanie projektu wizualnego jednolitego dla wszystkich P&R realizowanych w ramach RPO WM 2014-2020 na terenie Metropolii Krakowskiej. (Polish)
    0 references
    This project consists of the construction of a parking lot P&R and the interchange node. There will be 50 parking spaces in the parking lot for people with a public transport ticket, including two for people with disabilities. Due to significant differences in the level of the outer area, part of the car park was designed as a public space, where there will be 21 parking spaces. The underground section provides 29 parking spaces for passenger cars, as well as parking spaces for bicycles and other single-track vehicles.As well as a public toilet for users of the facility and the necessary technical spaces related to parking. The building is characterised by the following parameters: The cubicle: 3200 m³ Height 4,2 m Number of floors: And above-ground floor, (no cellaring) Building area: 762 m² The infrastructure is an integrated interchange hub integrating 2 collective transport subsystems (agglomeration buses and private carriers’ buses/buses) and individual transport of cars and bicycles as part of the P+R. The infrastructure of the hub includes parking spaces for cars, motorcycles and bicycles, a covered transport stop with timetables, enabling you to get acquainted with the traffic lines, as well as by hours and directions. The parking lot will be equipped with the necessary installations, including: water sewage, mechanical ventilation, electrical ventilation and monitoring. In addition, to improve the aesthetics of the object, it was designed to place elements of small architecture, such as benches, pots, lighting columns, garbage bins. The project provides for the marking of access to the parking lot by applying a uniform visual project for all P & Ps implemented within the framework of the RPO WM 2014-2020 in the Kraków Metropolis. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.05.01-12-0437/17
    0 references