Energy modernisation of the School and Gymnasian Team building in Łomnica Zdrój in the commune Piwniczna -Zdrój (Q112262)

From EU Knowledge Graph
Revision as of 12:32, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q112262 in Poland
Language Label Description Also known as
English
Energy modernisation of the School and Gymnasian Team building in Łomnica Zdrój in the commune Piwniczna -Zdrój
Project Q112262 in Poland

    Statements

    0 references
    746,266.83 zloty
    0 references
    179,104.04 Euro
    13 January 2020
    0 references
    1,243,778.06 zloty
    0 references
    298,506.73 Euro
    13 January 2020
    0 references
    60.0 percent
    0 references
    2 May 2016
    0 references
    29 December 2017
    0 references
    MIASTO I GMINA PIWNICZNA-ZDRÓJ
    0 references
    0 references
    Projektem objęty jest budynek Zespołu Szkół w Łomnicy-Zdroju. Zgodnie z przeprowadzonym audytem energetycznym dla budynku zdecydowano się na ujęcie w zakresie projektu następujących prac: 1. Docieplenie ścian, wymiana stolarki: - Wymiana instalacji c.o.na nową instalację z grzejnikami wyposażonymi w zawory termostatyczne (wraz z głowicami) oraz zawory podpionowe; - Ocieplenie ścian zewnętrznych technologii lekkiej-mokrej, gdzie grubość warstwy izolacji wyniesie 20 cm.; - Ocieplenie poddasza warstwą izolacji o grubości 18 cm, układaną na stropie poddasza. - Ocieplenie poddasza nad łącznikiem warstwą izolacji o grubości 20 cm; - Ocieplenie stropodachu warstwą izolacji o grubości 25 cm; - Wymiana stolarki okiennej (dotychczas nie wymienionej) na stolarkę (z PCV, profili AL. lub drewna) o całkowitym współczynniku Umax=1,10 W/(m2K); - Wymiana drzwi zewnętrznych drewnianych (wcześniej nie wymienionych) na drzwi (z PCV, aluminium lub drewna) o całkowitym współczynniku Umax=1,30 W/(m2K). - Wymiana drzwi zewnętrznych stalowych (wcześniej nie wymienionych) na drzwi (z PCV, aluminium lub drewna) o całkowitym współczynniku Umax=1,30 W/(m2K), - Modernizacja luksfer poprzez zastąpienie ich stolarką (z PCV, profili AL. lub drewna) o całkowitym współczynniku Umax=1,10 W/(m2K). Projekt cechują następujące wskaźniki: 1. % wartość poprawy efektywności energetycznej: 49,5 %; 2. W projekcie zostały zastosowane liczniki ciepła; 3. Audyt energetyczny budynku wskazuje na konieczność wprowadzenia urządzeń utrzymujących zadaną temp. poprzez aktywne działanie (termostaty) i/lub regulatory różnicy ciśnień (zawory podpionowe). W projekcie zostały zastosowane ww. urządzenia. 4. % wartość redukcji emisji CO2: 48,5%; 5. % wartość obniżenia emisji pyłów (PM 10 i PM 2,5): 49,5%. (Polish)
    0 references
    The project covers the building of the School Complex in Lomnica-Zdrój. In accordance with the energy audit carried out for the building, it was decided to include the following works on the project: 1. Wall warming, carpentry replacement: — Replacement of central heating system for a new installation with radiators equipped with thermostatic valves (including heads) and upholstery valves; — Warming of the external walls of light-wet technology, where the thickness of the insulation layer will be 20 cm.; — The warming attic with a layer of insulation of 18 cm thick, arranged on the ceiling of the attic. — Warming of the attic over the connector with a thickness of 20 cm; — Insulated insulation with a thickness of 25 cm; — Exchange of window joinery (not yet mentioned) into woodwork (from PVC, AL. profiles or wood) with total Umax = 1,10 W/(m2K); — Replacement of wooden external doors (formerly not mentioned) for doors (from PVC, aluminium or wood) with a total factor Umax=1,30 W/(m2K). — Exchange of steel external doors (formerly not mentioned) for doors (from PVC, aluminium or wood) with a total factor Umax = 1,30 W/(m2K), – Modernisation of the lux by replacing them with a carpentry (from PVC, AL. profiles or wood) with a total factor Umax=1.10 W/(m2K). The project shall be characterised by the following indicators: 1. % Energy Efficiency Improvement Value: 49,5 %; 2. Heat meters are used in the project; 3. The energy audit of the building indicates the necessity of introducing devices that maintain the specified tempo through active operation (thermostates) and/or regulators of pressure difference (sub-vertical valves). The above-mentioned devices were used in the project. 4. % CO2 reduction: 48,5 %; 5. % particulate emission reduction (PM 10 and PM 2,5): IT’S 49.5 %. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.03.02-12-0258/16
    0 references