Construction of photovoltaic roof installations (Q104996)

From EU Knowledge Graph
Revision as of 12:31, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q104996 in Poland
Language Label Description Also known as
English
Construction of photovoltaic roof installations
Project Q104996 in Poland

    Statements

    0 references
    90,766.23 zloty
    0 references
    21,783.90 Euro
    13 January 2020
    0 references
    139,640.36 zloty
    0 references
    33,513.69 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    1 February 2018
    0 references
    31 May 2018
    0 references
    PRZEDSIĘBIORSTWO USŁUGOWO-HANDLOWE "AB" SPÓŁKA JAWNA J. ARASIMOWICZ, F. BRZOZOWSKI
    0 references
    0 references
    Przedmiotem projektu jest wykonanie instalacji fotowolt.o łącznej mocy zainstalowanej 0,039 MW pokrywającej potrzeby własne przedsiębiorstwa na energie elektryczną, zlokalizowane w: 1. Budynek warsztatowy, Włodawa, działka nr 2429/11, powierzchnia dachu zajmowana prze panele to około 102,9, moc zainstalowana 17,01 kW. Wnioskodawca jest właścicielem budynku. 2. Budynek , Włodawa, działka nr 2429/16, powierzchnia dachu zajmowana prze panele to około 135,4 m2, moc zainstalowana 22,68 kW. Wnioskodawca jest właścicielem budynku. Elektrownia będzie się składać z wysokowydajnych paneli fotowoltaicznych (147 szt. o mocy 270 W zakładając wysoki minimalny współczynnik skuteczności modułu na poziomie 16,7%) zainstalowanych na konstrukcji stalowej, podłączonych do inwerterów o sprawności co najmniej 98%. Szczegółowo powyższe przedstawiono w projektach technicznych oraz kosztorysach. Ze względu na położenie instalacji (jeden z najbardziej nasłonecznionych regionów w kraju) będzie ona w stanie wyprodukować w ciągu roku łącznie około 42 MWh energii elektr. Wytworzona energia elektr. będzie zużyta na zapewnienie potrzeb własnych przedsiębiorstwa. Przewidywany czas eksploatacji instalacji to 25 lat. Zastosowana technologia spełnia kryteria i normy ekologiczne UE określone w obwieszczeniach Prezesa PKN w sprawie wykazu norm zharmonizowanych. Projekt będzie realizowany w II połowie 2018 r. Na dzień złożenia wniosku Wnioskodawca posiada wszystkie formalno-prawne dokumenty (zgodnie z art. 29 ust. 2 pkt 16 Prawa Budowlanego Montaż urządzeń fotowoltaicznych o zainstalowanej mocy elektrycznej dp 40 kW oraz wolnostojących kolektorów nie wymaga zgłoszenia właściwemu organowi ani pozwolenia na budowę), nie występuje ryzyko nie zrealizowania projektu z przyczyn niezależnych od Wnioskodawcy. Projekt będzie realizowany jednoetapowo. W wyniku realizacji projektu nastąpi zmniejszenie emisji CO2 do atmosfery o 13,955 t. Okres realizacji jest adekwatny do zaplanowanych elementów projektu. (Polish)
    0 references
    The object of the project is the construction of a photovolt. with a total installed capacity of 0,039 MW covering the company’s own needs for electricity, located in: 1. Workshop building, Włodawa, plot No 2429/11, roof area occupied by panels is about 102.9, installed power 17.01 kW. The applicant owns the building. 2. Building, Włodawa, plot No 2429/16, roof area occupied by panels is about 135.4 m², installed power 22.68 kW. The applicant owns the building. The power plant will consist of high-performance photovoltaic panels (147 pieces with a capacity of 270 W, assuming a high minimum module performance ratio of 16.7 %) installed on steel structure, connected to inverters with an efficiency of at least 98 %. This is detailed in the technical projects and in the financial statements. Due to the location of the installation (one of the most sunny regions in the country), it will be able to produce a total of around 42 MWh of electricity per year. The electricity generated will be used to provide the company’s own needs. The estimated operating time of the installation is 25 years. The technology used meets the EU ecological criteria and standards set out in the notice of the President of the PKN on the list of harmonised standards. The project will be implemented in the second half of 2018. On the date of submission of the application, the applicant has all formal and legal documents (in accordance with Article 29 paragraph. 2 point 16 of the Construction Law The installation of photovoltaic equipment with installed electrical power dp 40 kW and free standing manifolds does not require notification to the competent authority or construction permit), there is no risk of failure of the project for reasons independent of the Applicant. The project will be implemented in one step. The project will result in a reduction of CO2 emissions to the atmosphere by 13.955 t. Period of implementation is adequate to the planned elements of the project. (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.04.02.00-06-0252/17
    0 references