Construction and modernisation of energy-saving street lighting installations in the Big Niedoor Building (Q105551)

From EU Knowledge Graph
Revision as of 11:59, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q105551 in Poland
Language Label Description Also known as
English
Construction and modernisation of energy-saving street lighting installations in the Big Niedoor Building
Project Q105551 in Poland

    Statements

    0 references
    1,599,749.3 zloty
    0 references
    383,939.83 Euro
    13 January 2020
    0 references
    1,882,058.0 zloty
    0 references
    451,693.92 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    15 November 2016
    0 references
    30 April 2019
    0 references
    GMINA NIEDRZWICA DUŻA
    0 references
    Celem projektu (P) jest oprawa jakości środowiska naturalnego wGminie Niedrzwica Duża dzięki wymianie oświetlenia ulicznego na energ.W ramach P wykonane zostaną prace polegające na zmniejszeniu zainstalowanych mocy opraw oświetleniowych (o. oś.) dzięki wdrożeniu technologii niskoemisyjnych tj. źródeł typu LED: demontaż istniejącego i nieefektywnego systemu oświetlenia (demontaż istniejącego systemu); montaż efektywnych o.oś. (montaż opraw oś. typu LED w ilości 922 szt.; montażwysięgników rurowych oraz konstrukcji stalowych dla osprzętu linii napowietrznych na wysięgniku; montaż przewodów do o.oś., skrzynek bezpiecznikowych, izolowanych złącz kablowych, układów kompensacji mocy biernej i zabezpieczeniem przeciwprzepieciowym. Dodatkowo P zakłada wdrożenie systemu sterowania strumieniem świetlnym oraz monitoringiem wraz z wyposażeniem centrum dyspozytorskiego (CD)oraz działania promocyjno-inf.dotyczące mini. konsumpcji energii i zmniejszenie energochłonności. P będzie pozytywnie wpływał na wzrost jakości użytkowania instalacji oraz obniżanie kosztów związanych ze zużyciem energii oraz konserwacją. W wynikurealizacji P nastąpi znaczna redmocy istniejących o.oś. tj. o 63,4% (przed realizacją P moc zainstalowana systemu na poziomie 137,48 kW, po realizacji P: 50,38 kW). P jest również korzystny ze względu na realizację celów środowiskowych jakimi są obniżenie zanieczyszczeń powietrza oraz podniesienie atrakcyjności przyrodniczej terenu gminy. Przedmiotowy projekt jest spójny zgodny z "Planem gospodarki niskoemisyjnej dla Gminy Niedrzwica Duża", którego celem jest poprawa jakości powietrza do poziomów dopuszczalnych i docelowych, mi.in. poprzez ograniczenie emisji dzięki przeprowadzonej wymianie oświetlenia ulicznego na energoosz. P zakłada roczne zwiększenie efekt. e.na poziomie 361 MWh (tj.63,4%).P zakłada utworzenie CD umożliwiającego stały monitoring pracy systemu w tym zużycia energii elektrycznej (końcowej), monitoring obejmie również analizę faktur od dostawców e.e. (Polish)
    0 references
    The aim of the project (P) is to fix the quality of the environment in the Nie door district Large thanks to the exchange of street lighting with energies.In the framework of P works will be carried out to reduce the installed power of luminaires (axle) thanks to the implementation of low-carbon technologies, i.e. LED sources: dismantling an existing and inefficient lighting system (disassembly of an existing system); assembly of effective axles. (assembly of LED dc mountings in the amount of 922 pcs; installation of tubular booms and steel structures for overhead line fittings on the boom; assembly of cables for axles, fuse boxes, insulated cable connectors, passive power compensation systems and overpass protection. In addition, P assumes the implementation of a control system for light flux and monitoring with equipment of the dispatching centre (CD) and promotional-inf. activities concerning mini. energy consumption and reduction of energy intensity. P will have a positive impact on the quality of use of the installation and reduction of costs related to energy consumption and maintenance. The implementation of P will result in significant redpowers of existing axles, i.e. by 63.4 % (before P the installed capacity of the system at the level of 137.48 kW, after completion of P: 50,38 kW). P is also beneficial because of the environmental objectives of reducing air pollution and increasing the natural attractiveness of the municipality’s area. This project is consistent with the “Low-Emissions Plan for the Municipality of Niedoorzwica Large”, which aims to improve air quality to acceptable and target levels, e.g. by reducing emissions through the exchange of street lighting for energy. P assumes an annual increase in the effect. e. at the level of 361 MWh (i.e.63.4 %).P assumes the creation of a CD allowing continuous monitoring of the system’s operation, including electricity consumption (final energy consumption), monitoring will also include the analysis of invoices from e.e. suppliers. (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.05.05.00-06-0021/16
    0 references