Improving energy efficiency, thermal modernisation, modernisation and overhaul of the public utility facility – the building of the Primary School in Białka (Q105390)

From EU Knowledge Graph
Revision as of 11:46, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q105390 in Poland
Language Label Description Also known as
English
Improving energy efficiency, thermal modernisation, modernisation and overhaul of the public utility facility – the building of the Primary School in Białka
Project Q105390 in Poland

    Statements

    0 references
    782,673.64 zloty
    0 references
    187,841.67 Euro
    13 January 2020
    0 references
    920,792.56 zloty
    0 references
    220,990.21 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    13 July 2017
    0 references
    30 June 2021
    0 references
    GMINA MILEJÓW
    0 references
    Celem głównym projektu jest poprawa efektywności energetycznej w budynku Szkoły Podstawowej im. A. Mickiewicza w Białce poprzez realizację kompleksowych zadań termomodernizacyjnych np.: modernizację c.o., modernizację instalacji wentylacji, ocieplenie stropu ostatniej kondygnacji i dachu, ocieplenie ścian zewnętrznych, wymiana okien i drzwi, ocieplenie podłóg. Do realizacji zaplanowano także montaż instalacji fotowoltaicznej składającej się paneli fotowoltaicznych wykonanych w technologii monokrystalicznych o mocy 7,42 kWp. Kluczowe rezultaty projektu wyrażone wskaźnikami rezultatu to:1.Ilość zaoszczędzonej energii cieplnej[GJ/rok:1241]2.Ilość zaoszczędzonej energii elektrycznej[MWh/rok: 12,787]3.Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych [kWh/rok:417540]4.Szacowany roczny spadek emisji gazów cieplarnianych[tony równoważnika CO2/rok:4043]5.Produkcja energii elektrycznej z nowo wybudowanych / nowych mocy wytwórczych instalacji wykorzystujących OZE [MWhe/rok:8,076]6. Produkcja energii z nowo wybudowanych mocy wytwórczych instalacji wykorzystujących OZE [MWhe/rok:8,076].W wyniku realizacji projektu nastąpi zwiększenie efektywności energetycznej budynku o 78,59 %. Grupą docelową projektu są mieszkańcy Milejowa, ze szczególnym uwzględnieniem pracowników i uczniów Szkoły Podstawowej im. A. Mickiewicza w Białce.Po stronie kosztów niekwalifikowanych robót budowlanych ujęto: roboty rozbiórkowe, nadproża stalowe, roboty murowe, elementy betonowe, dach - roboty rozbiórkowe, stolarka drzwiowa wewnętrzna, tynki wewnętrzne, oblicowanie ścian, sufity podwieszane, roboty malarskie, podłoża, posadzki, roboty ślusarskie, podjazd dla niepełnosprawnych i schody zewnętrzne, elementy zewnętrzne, instalacja uziemiająca i odgromowa, montaż osprzętu, okablowanie, instalacje RTV - przystosowanie, demontaże, instalacja wodociągowa, kotły i akcesoria, kanalizacja. (Polish)
    0 references
    The main objective of the project is to improve energy efficiency in the building of the A. Mickiewicz Primary School in Białka through comprehensive thermomodernisation tasks, e.g.: modernisation of central heating, modernisation of ventilation systems, warming of the ceiling of the last floor and roof, warming of external walls, replacement of windows and doors, warming of floors. The installation of a photovoltaic installation consisting of photovoltaic panels made in monocrystalline technology with a power of 7.42 kWp was also planned. The key results of the project as expressed in the result indicators are:1.The amount of heat saved[GJ/year:1241]2.The amount of electricity saved[MWh/year: 12,787]3.Reduction of annual primary energy consumption in public buildings [kWh/year:417540]4.An estimated annual decrease in greenhouse gas emissions[tonnes CO2/year:4043]5.Manufacture of electricity from newly built/new RES installations [MWhe/year:8,076]6. Energy production from newly built RES installations [MWhe/year:8,076].As a result of the project, the energy efficiency of the building will be increased by 78.59 %. The target group of the project is the inhabitants of Milejów, with special attention to employees and students of the A. Mickiewicz Primary School in Białka.On the side of the costs of ineligible construction works are included: demolition works, steel pavement, masonry, concrete elements, roof – demolition works, interior carpentry, internal plaster, wall facing, suspended ceilings, painting works, floors, locksmiths, driveway for disabled and external stairs, external elements, ground and lightning installation, installation of fittings, wiring, wiring, RTV installations – adaptation, dismantling, dismantling, lightning installation, fittings, wiring, RTV installations – adaptation, water dismantling, lightning installation (English)
    20 October 2020
    0 references

    Identifiers

    RPLU.05.02.00-06-0077/17
    0 references