Thermal modernisation, modernisation and overhaul of the Kornel Makuszyński Primary School in Łańcuchów (Q105418)

From EU Knowledge Graph
Revision as of 11:39, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q105418 in Poland
Language Label Description Also known as
English
Thermal modernisation, modernisation and overhaul of the Kornel Makuszyński Primary School in Łańcuchów
Project Q105418 in Poland

    Statements

    0 references
    960,665.06 zloty
    0 references
    230,559.61 Euro
    13 January 2020
    0 references
    1,130,194.21 zloty
    0 references
    271,246.61 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    22 June 2016
    0 references
    15 December 2019
    0 references
    GMINA MILEJÓW
    0 references
    W ramach projektu Wnioskodawca zaplanował inwestycję polegającą na termomodernizacji budynku Szkoły podstawowej w Łańcuchowie zlokalizowanej na terenie Gminy Milejów. Celem głównym projektu jest podniesienie jakości świadczonych usług społecznych dzięki poprawie efektywności energetycznej w budynkach użyteczności publicznej. W ramach inwestycji osiągnięte zostanie zwiększenie efektywności energetycznej budynku o 46,43 %. Zakres robót wynikający z audytu energetycznego: Modernizacja przegrody DZ 1-stalowe 'Wentylacja grawitacyjna' Modernizacja przegrody DZ 3-stalowe-kotłownia 'Wentylacja grawitacyjna' Modernizacja przegrody OZ 1 'Wentylacja grawitacyjna' Modernizacja przegrody DZ 2-Piwnca- 'Wentylacja grawitacyjna' Modernizacja systemu ciepłej wody użytkowej Modernizacja przegrody Strop zewnętrzny Modernizacja przegrody Dach Modernizacja przegrody Ściana zewnętrzna Modernizacja przegrody Ściana na gruncie Modernizacja przegrody Dach Modernizacja systemu grzewczego Pozostałe roboty budowlane związane z termomodernizacją Montaż instalacji fotowoltaicznej o mocy 10,08 kWp W ramach inwestycji osiągnięte zostaną następujące wartości wskaźników rezultatu: 1.Ilość zaoszczędzonej energii cieplnej:430,60 GJ/rok 2. Produkcja energii elektrycznej z nowowybudowanych/nowych mocy wytwórczych instalacji wykorzysujących OZE - MWht /tok 11,14 3. Szacowany roczny spadek emisji gazów cieplarnianych 38,58 ton CO2/rok. 4 Produkcja energii elektrycznej z nowowybudowanych mocy wytwórczych instalacji wykorzysujących OZE - MWht /tok 11,14 5.Produkcja energii cieplnej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE: 26,60 MWh/rok. 6 Produkcja energii elektrycznej z nowowybudowanych mocy wytwórczych instalacji wykorzysujących OZE - MWht /tok 11,14 7. Produkcja energii cieplnej z nowowybudowanych mocy wytwórczych instalacji wykorzysujących OZE - MWht /tok 26,60 MWh/rok. 8. Zmniejszenie zużycia energii pierwotnej w budynkach publicznych- kwh/rok 160838,33 (Polish)
    0 references
    As part of the project, the applicant planned an investment in the thermal modernisation of the primary school in Łańcuchów, located in the Milejów commune. The main objective of the project is to improve the quality of social services provided by improving energy efficiency in public buildings. As part of the investment, the energy efficiency of the building will be increased by 46.43 %. Scope of works resulting from the energy audit: Modernisation of the 1-steel partition DZ ‘Gravitational ventilation’ Modernisation of the division DZ 3-steel-boiler room ‘Gravitational ventilation’ Modernisation of the partition OZ 1 ‘Gravitational ventilation’ Modernisation of the bulkhead DZ 2-Piwncare- ‘Gravitational ventilation’- ‘Great ventilation’ Modernisation of the construction system Modernisation of the external ceiling Modernisation of the bulkhead Modernisation of the system Modernisation of the system Modernisation of the observable system Modernisation of the observable system Modernisation of the barrier Modernisation of the system Modernisation of the 1-steel partition ‘Grillational ventilation’ Modernisation of the partition DZ 3-steel-boiler room ‘Gyvitational ventilation’ Modernisation of the obstruction system OZ 1 ‘Gygravitational ventilation’ Modernisation of the bulkheads DZ 2-Piwn construction-continuum-continuation-“Gravitational ventilation” Modernisation of the construction system Modernisation of the external ceiling Modernisation of the bulkheads Modernisation of the system Modernisation of the system Modernisation of the system Modernisation of the construction of the thermal water system 1.The amount of thermal energy saved: 430,60 GJ/year 2. Production of electricity from newly built/new generation capacity of RES-use installations – MWht/tok 11,14 3. Estimated annual decrease in greenhouse gas emissions of 38.58 tonnes of CO2/year. 4 Manufacture of electricity from newly built RES power plants – MWht/tok 11,14 5.Production of heat from newly built/new RES installations: 26,60 MWh/year. 6 Manufacture of electricity from newly built RES power plants – MWht/tok 11,14 7. Production of thermal energy from newly built RES power plants – MWht/tok 26,60 MWh/year. 8. Reduction of primary energy consumption in public buildings – kwh/year 160838,33 (English)
    20 October 2020
    0 references

    Identifiers

    RPLU.05.02.00-06-0092/16
    0 references