Thermal modernisation of the building of the Municipal Office in Krzczonów_2 (Q105412)

From EU Knowledge Graph
Revision as of 11:39, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q105412 in Poland
Language Label Description Also known as
English
Thermal modernisation of the building of the Municipal Office in Krzczonów_2
Project Q105412 in Poland

    Statements

    0 references
    287,431.74 zloty
    0 references
    68,983.62 Euro
    13 January 2020
    0 references
    338,155.04 zloty
    0 references
    81,157.21 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    19 October 2018
    0 references
    29 November 2021
    0 references
    GMINA KRZCZONÓW
    0 references
    Celem głównym projektu jest poprawa jakości środowiska naturalnego w gm. Krzczonów poprzez termomodernizację budynku Urzędu Gminy zlokalizowanego w przy ul. Spokojnej 7 w Krzczonowie. Realizacja projektu posłuży zmniejszeniu zapotrzebowania na energię z paliw kopalnych w przedmiotowym budynku. Ponadto przeprowadzenie procesu kompleksowej termomodernizacji przyczyni się do redukcji zanieczyszczenia powietrza atmosferycznego i poprawie jego jakości. Stanie się to dzięki zmniejszeniu emisji gazów cieplarnianych i pyłów do atmosfery. W konsekwencji inwestycja ta poprawi komfort życia mieszkańców m.in. poprzez stworzenie dostępu do nowoczesnej infrastruktury publicznej czy obniżenie kosztów eksploatacji tej infrastruktury oraz podniesie atrakcyjność społeczno-gospodarczą gminy. Zakłada się przeprowadzenie następujących prac: - wykonanie modernizacji instalacji c.o. poprzez wymianę grzejników, montaż zaworów odcinających, równoważących, odpowietrzających, termostatycznych, licznika ciepła oraz wymianę źródła na gazowy kocioł kondensacyjny na gaz płynny wraz z wykonaniem zbiornika na gaz płynny i podłączenia do budynku. - docieplenie ścian zew. wraz z wymianą obróbek blacharskich, orynnowania, obrobieniem glifów, zmin. mostków cieplnych; - docieplenie stropu nad pomieszczeniami ogrzewanymi; - w. nawiewników ciśnieniowych, wymianę uszczelek, regulację okien PVC oraz wymianę okien w podziemiu; - wymianę drzwi zewnętrznych; - usprawnienie instalacji c.w.u.; - wymiana opraw na LED z czujką ruchu; - wykonanie instalacji PV. W wyniku realizacji projektu ilość zaoszczędzonej energii cieplnej wyniesie 176,00 GJ/rok. O 130 753,49 kWh/rok zmniejszy się także roczne zużycie energii pierwotnej w budynkach publ. Szacuje się ponadto, że roczny spadek emisji gazów cieplarnianych wyniesie 42,29 tqCO2. Dodatkowa zdolność energii wytwarzanej z OZE wyniesie z kolei 0,0168 MWt, a produkcja energii elektrycznej z OZE osiągnie wartość 14,396 MWhe/rok. (Polish)
    0 references
    The main objective of the project is to improve the quality of the natural environment in the Krzczonów building through the thermal modernisation of the building of the Municipal Office located in the street. Quiet 7 in Krzczonów. The implementation of the project will help reduce the demand for energy from fossil fuels in this building. In addition, a process of comprehensive thermal modernisation will contribute to reducing atmospheric air pollution and improving its quality. This will be done by reducing emissions of greenhouse gases and dust into the atmosphere. As a result, this investment will improve the comfort of life of residents, e.g. by creating access to modern public infrastructure or reducing the costs of operating this infrastructure and will increase the socio-economic attractiveness of the municipality. The following work is expected to be carried out: — modernisation of the central heating system by replacing radiators, installation of shut-off valves, balancing valves, venting, thermostatic, heat counter and replacement of the source with gas condensation boiler with liquid gas tank and connection to the building. — warming of the so-called walls together with the exchange of sheet metalworking, ornamentation, glyph treatment, thermal bridges; — warming of the ceiling over heated spaces; — pressure vents, replacement of gaskets, adjustment of PVC windows and replacement of windows in the underground; — replacement of external doors; — streamlining the installation of c.w.u.; — exchange of luminaires for LED with motion detector; — execution of PV installation. As a result of the project, the amount of thermal energy saved will be 176.00 GJ/year. Annual primary energy consumption in publ buildings will also decrease by 130753.49 kWh/year. It is also estimated that the annual reduction in greenhouse gas emissions will be 42.29 tqCO2. The additional capacity of RES generation will be 0.0168 MWt and the production of electricity from RES will reach 14.396 MWhe/year. (English)
    20 October 2020
    0 references

    Identifiers

    RPLU.05.02.00-06-0087/19
    0 references