Production of energy from RES in Ferma Drobiu Spółka Jawna, E. and W. Szewczyk, MGR H. and K. Błachnio (Q104835)

From EU Knowledge Graph
Revision as of 11:38, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q104835 in Poland
Language Label Description Also known as
English
Production of energy from RES in Ferma Drobiu Spółka Jawna, E. and W. Szewczyk, MGR H. and K. Błachnio
Project Q104835 in Poland

    Statements

    0 references
    120,250.0 zloty
    0 references
    28,860.0 Euro
    13 January 2020
    0 references
    185,000.0 zloty
    0 references
    44,400.0 Euro
    13 January 2020
    0 references
    65.0 percent
    0 references
    1 June 2017
    0 references
    30 November 2018
    0 references
    FERMA DROBIU SPÓŁKA JAWNA, E. I W. SZEWCZYK, MGR H. I K. BŁACHNIO
    0 references
    0 references
    Celem projektu jest realizacja zadań przyczyniających się do wypełnienia zobowiązań wynikających z tzw. pakietu energet-klimatycznego UE oraz Strategii Europa 2020. Działanie ukierunkowane jest na stworzenie konkurencyjnego rynku energii odnawialnej, który będzie jednym z elementów zrównoważonego rozwoju regionu oraz zaspokojenia rosnących potrzeb energetycznych lokalnej gospodarki. Wspierane działania mają zapewnić dywersyfikację dostaw energii, oraz zwiększyć bezp. energet. regionu, przy wykorzystaniu jego naturalnych uwarunkowań i potencjałów, zgodnie z progr. wojewódzkim dot.wsparcia OZE, realizującym założenia Strategii Bezpieczeństwo Energetyczne i Środowisko. W wyniku realizacji projektu zostaną zakupione i zamontowane urządz. fotowoltaiczne na budynkach zlokalizowanych w Moszczance na dz.ewid. nr 352/4; 352/1; 352/3 i 353/1. Moc planowanej do zamontowania instalacji wynosi 39,5-40kWp. W ramach powyższej instalacji zaplanowano:Zakup i montaż urządzeń fotowoltaicznych Powyższe zad. składało się będzie z:Modułów polikrystalicznych-152szt. Inwerter trzyfazowy-1szt. Inwerter trzyfazowy-1szt. System montażowy nn dach skośny-40szt. Kabel solarny DC 4mm-200mb Konektor MC4 -16szt. Konektor MC4-16szt. Zabezpiecz. przeciwprzepięciowe i różnicowo-prądowe DC i AC 2 stringi inwerter trzyfazowy - 1szt. Montaż urządzeń-1 szt. Realizacja projektu przyczyni się do osiągnięcia wskaźników: Wsk.produktu:WLWK?:liczba wybud. jedn. wytwarzania energii elektr. z OZE [szt.]I rozliczeniowy-1szt. WLWK?:Liczba przedsiębiorstw otrzymujących wsparcie (CI1) [szt.]I rozliczeniowy-1szt. WLWK?:Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych (CI30) [MW]I rozliczeniowy-1szt. WLWK?:Dodatkowa zdolność wytwarzania energii elektr. ze źródeł odnawialnych [MWe]I rozliczeniowy-1szt. Wsk.rezultatu:WLWK?:Produkcja energii elektr. z nowo wyb.instalacji wykorzystujących OZE [MWht/rok]I rozliczeniowy 35,74 MWhe/rok. Grupa docelowa-lokalni odbiorcy energii elektr. Nowy produkt-prąd elektryczny (Polish)
    0 references
    The aim of the project is to implement the tasks contributing to the fulfilment of the obligations arising from the so-called EU energy-climate package and the Europe 2020 Strategy. The action is aimed at creating a competitive market for renewable energy, which will be one of the elements of the region’s sustainable development and to meet the growing energy needs of the local economy. The supported activities are designed to ensure diversification of energy supply, and increase the energy-free region, using its natural conditions and potentials, according to the provincial RES support threshold, implementing the objectives of the Energy Security and Environment Strategy. As a result of the project, photovoltaic equipment will be purchased and installed on buildings located in Moszczanka on dz.ewid. nr 352/4; 352/1; 352/3 and 353/1. The power of the planned installation is 39.5-40kWp. As part of the above installation, it is planned to: Purchase and assembly of photovoltaic devices The above will consist of:Polycrystalline modules-152pcs. Three-phase inverter-1pcs. Three-phase inverter-1pcs. Installation system nn slant roof-40pcs. Solar cable DC 4 mm-200mb Connector MC4-16pcs. Connector MC4-16 pcs. Protect. overvoltage and differential current DC and AC 2 string three-phase inverter – 1pcs. Installation of devices-1 pcs. The implementation of the project will contribute to the achievement of indicators: Product:WLWK?:number of constructions. one. generating electricity from RES [pc.] and settlement-1pcs. WLWK?:Number of enterprises receiving support (CI1) [pc.] and clearing-1pcs. WLWK?:Additional capacity to generate energy from renewable sources (CI30) [MW]and settlement-1pcs. WLWK?:Additional capacity of electricity generation from renewable sources [MWe]I settlement – 1pcs. Result:WLWK?:Manufacture of electricity from a newly developed RES installation [MWht/year]and settlement of 35,74 MWhe/year. Target-local group of electricity consumers. New product-electric current (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.04.02.00-06-0009/17
    0 references